Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsNAICS | 33591 | Battery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0331 # 08 Y:2022 | 08 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $110,196 | $55,220 | Not Implemented |
MZ0331 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,162 | $25,757 | Implemented |
MZ0331 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,037 | $46,350 | Implemented |
MZ0331 # 03 Y:2022 | 03 | 2022 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $91,773 | $9,040 | Implemented |
MZ0331 # 04 Y:2022 | 04 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,985 | $29,286 | Implemented |
MZ0331 # 05 Y:2022 | 05 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $402,938 | $1,820,000 | Not Implemented |
MZ0331 # 06 Y:2022 | 06 | 2022 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $31,613 | $98,280 | Implemented |
MZ0331 # 07 Y:2022 | 07 | 2022 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $76,144 | $423,000 | Not Implemented |
MZ0237 # 01 Y:2017 | 01 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,793 | $0 | Implemented |
MZ0237 # 02 Y:2017 | 02 | 2017 | INSTALL OCCUPANCY SENSORS | $262 | $800 | Not Implemented |
MZ0237 # 03 Y:2017 | 03 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,548 | $0 | Not Implemented |
MZ0237 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $599 | $50 | Implemented |
MZ0237 # 05 Y:2017 | 05 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $36,123 | $11,000 | Implemented |
MZ0237 # 06 Y:2017 | 06 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,362 | $25,000 | Implemented |
MZ0237 # 07 Y:2017 | 07 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $69 | $0 | Implemented |
MZ0237 # 08 Y:2017 | 08 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $22,338 | $0 | Implemented |
MZ0106 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,548 | $31,400 | Implemented |
MZ0106 # 09 Y:2012 | 09 | 2012 | INSTALL OCCUPANCY SENSORS | $88,236 | $30,000 | Not Implemented |
MZ0106 # 08 Y:2012 | 08 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $18,537 | $1,200 | Not Implemented |
MZ0106 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,893 | $850 | Implemented |
MZ0106 # 06 Y:2012 | 06 | 2012 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $7,267 | $25,000 | Implemented |
MZ0106 # 05 Y:2012 | 05 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $20,969 | $3,000 | Implemented |
MZ0106 # 04 Y:2012 | 04 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $87,874 | $6,500 | Not Implemented |
MZ0106 # 03 Y:2012 | 03 | 2012 | INSTALL OCCUPANCY SENSORS | $5,174 | $1,750 | Implemented |
MZ0106 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $55,068 | $26,420 | Not Implemented |