IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

14

matching recommendations
Reset
NAICS 33593 Wiring Device Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0662 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,757 $2,000 n/a
NC0662 # 02 Y:2021 02 2021 RECOVER WASTE HEAT FROM EQUIPMENT $4,792 $5,472 n/a
NC0662 # 03 Y:2021 03 2021 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,634 $39,970 n/a
NC0662 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,566 $3,150 n/a
NC0662 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $64 $280 n/a
NC0662 # 06 Y:2021 06 2021 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $19,234 $75,000 n/a
NC0662 # 07 Y:2021 07 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $78,648 $250,000 n/a
NC0430 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,839 $0 Implemented
NC0430 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,052 $100 Implemented
NC0430 # 03 Y:2011 03 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,314 $150 Implemented
NC0430 # 04 Y:2011 04 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $11,250 $22,950 Not Implemented
NC0430 # 05 Y:2011 05 2011 REPLACE BOILER $3,539 $11,800 Not Implemented
NC0430 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,385 $4,833 Implemented
NC0430 # 07 Y:2011 07 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $30,360 $161,900 Not Implemented