IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

105

matching recommendations
Reset
NAICS 335931 Current-Carrying Wiring Device Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0474 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $357 $650 Implemented
SU0474 # 05 Y:2019 05 2019 OPTIMIZE PLANT POWER FACTOR $8,523 $18,735 Implemented
MI0320 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $53,871 $1,660 Implemented
MI0320 # 04 Y:2017 04 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $40,560 $27,600 Implemented
MI0320 # 02 Y:2017 02 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $58,406 $120 Implemented
MI0320 # 06 Y:2017 06 2017 OPTIMIZE PLANT POWER FACTOR $18,035 $23,565 Implemented
MI0320 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $23,860 $3,600 Implemented
MZ0203 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,707 $11,425 Implemented
MZ0203 # 03 Y:2016 03 2016 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $324 $1,975 Implemented
MZ0203 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $3,747 $680 Implemented
SU0375 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $221 $539 Implemented
SU0375 # 07 Y:2014 07 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $496 $2,007 Implemented
SU0375 # 02 Y:2014 02 2014 PAY BILLS ON TIME TO AVOID LATE FEES $291 $0 Implemented
SU0375 # 03 Y:2014 03 2014 DISCONNECT BALLASTS $148 $0 Implemented
SU0375 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,510 $765 Implemented
MA0694 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $2,300 $16,608 Implemented
MA0694 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $503 $900 Implemented
MA0694 # 03 Y:2012 03 2012 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $5,619 $0 Implemented
MA0694 # 01 Y:2012 01 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $12,023 $500 Implemented
MI0215 # 05 Y:2012 05 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,815 $1,300 Implemented
MI0215 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $15,517 $8,000 Implemented
NC0435 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,479 $72,211 Implemented
NC0435 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $661 $1,911 Implemented
NC0435 # 03 Y:2011 03 2011 INSTALL SPECTRAL REFLECTORS / DELAMP $1,887 $7,760 Implemented
NC0435 # 06 Y:2011 06 2011 INSTALL TIMERS AND/OR THERMOSTATS $295 $1,500 Implemented