IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

324

matching recommendations
Reset
NAICS 33599 All Other Electrical Equipment and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0736 # 03 Y:2006 03 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $29,250 $20,340 Implemented
OK0736 # 04 Y:2006 04 2006 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $8,438 $765 Implemented
OK0736 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,322 $1,267 Implemented
OK0736 # 06 Y:2006 06 2006 USE PHOTOCELL CONTROLS $3,268 $225 Not Implemented
WV0343 # 01 Y:2006 01 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,166,408 $1,460,000 Not Implemented
WV0343 # 02 Y:2006 02 2006 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,096,704 $1,539,100 Not Implemented
WV0343 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $21,955 $3,114 Implemented
WV0343 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,918 $0 Implemented
WV0343 # 05 Y:2006 05 2006 RECOVER WASTE HEAT FROM EQUIPMENT $11,836 $2,255 Not Implemented
WV0343 # 06 Y:2006 06 2006 DEVELOP A REPAIR/REPLACE POLICY $4,236 $635 Implemented
SU0232 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,030 $0 Implemented
SU0232 # 02 Y:2006 02 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,876 $0 Implemented
SU0232 # 03 Y:2006 03 2006 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,612 $0 Implemented
SU0232 # 04 Y:2006 04 2006 USE SYNTHETIC LUBRICANT $890 $0 Implemented
SU0232 # 05 Y:2006 05 2006 PAY BILLS ON TIME TO AVOID LATE FEES $773 $0 Implemented
SU0232 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $1,165 $225 Not Implemented
SU0232 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,647 $583 Implemented
SU0232 # 08 Y:2006 08 2006 KEEP BOILER TUBES CLEAN $2,880 $1,534 Implemented
SU0232 # 09 Y:2006 09 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,307 $1,182 Not Implemented
SU0232 # 10 Y:2006 10 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,585 $9,380 Not Implemented
SU0232 # 11 Y:2006 11 2006 REDUCE VENTILATION AIR $12,512 $26,994 Not Implemented
SU0232 # 12 Y:2006 12 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,616 $11,554 Not Implemented
SU0232 # 13 Y:2006 13 2006 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $517 $1,545 Not Implemented
SU0232 # 14 Y:2006 14 2006 INSTALL OCCUPANCY SENSORS $651 $2,039 Not Implemented
SU0232 # 15 Y:2006 15 2006 OPTIMIZE PLANT POWER FACTOR $1,024 $9,635 Not Implemented