Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

337

matching recommendations
Reset
NAICS 33599 All Other Electrical Equipment and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0003 # 02 Y:2017 02 2017 ISOLATE HOT OR COLD EQUIPMENT $1,797 $14,000 Implemented
NL0003 # 03 Y:2017 03 2017 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $1,586 $4,300 Not Implemented
NL0003 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $348 $1,250 Not Implemented
NL0003 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $200 $250 Not Implemented
WV0544 # 01 Y:2017 01 2017 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $455,414 $1,455,300 Not Implemented
WV0544 # 02 Y:2017 02 2017 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $113,487 $482,000 Not Implemented
WV0544 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $65,441 $142,350 Not Implemented
WV0544 # 04 Y:2017 04 2017 RECYCLE WHITE WATER $61,512 $25,000 Implemented
WV0544 # 05 Y:2017 05 2017 IMPROVE COMBUSTION CONTROL CAPABILITY $50,032 $125,526 Not Implemented
WV0544 # 06 Y:2017 06 2017 INCREASE AMOUNT OF CONDENSATE RETURNED $26,543 $125,000 Not Implemented
WV0544 # 07 Y:2017 07 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,362 $0 Implemented
WV0544 # 08 Y:2017 08 2017 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $10,299 $1,000 Implemented
WV0544 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,346 $25,467 Not Implemented
WV0544 # 10 Y:2017 10 2017 DEVELOP A REPAIR/REPLACE POLICY $4,065 $1,108 Implemented
WV0544 # 11 Y:2017 11 2017 UPGRADE CONTROLS ON COMPRESSORS $3,967 $15,395 Not Implemented
WV0544 # 12 Y:2017 12 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,588 $2,000 Implemented
WV0544 # 13 Y:2017 13 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,526 $732 Implemented
WV0544 # 14 Y:2017 14 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,358 $3,438 Not Implemented
WV0544 # 15 Y:2017 15 2017 INSULATE BARE EQUIPMENT $268 $876 Not Implemented
WM0079 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,526 $12,300 Not Implemented
WM0079 # 02 Y:2015 02 2015 USE SYNTHETIC LUBRICANT $8,412 $2,365 Not Implemented
WM0079 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,351 $1,600 Not Implemented
WM0079 # 04 Y:2015 04 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,974 $150 Not Implemented
WM0079 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,338 $1,470 Not Implemented
WM0079 # 06 Y:2015 06 2015 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,982 $198 Not Implemented