Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsNAICS | 33599 | All Other Electrical Equipment and Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0620 # 05 Y:2013 | 05 | 2013 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $584 | $2,554 | Not Implemented |
OR0620 # 04 Y:2013 | 04 | 2013 | MODIFY STARTUP/SHUTDOWN TIMES | $442 | $481 | Not Implemented |
OR0620 # 03 Y:2013 | 03 | 2013 | INSULATE BARE EQUIPMENT | $456 | $163 | Not Implemented |
OR0620 # 02 Y:2013 | 02 | 2013 | REDUCE VENTILATION AIR | $28,525 | $3,200 | Not Implemented |
OR0620 # 01 Y:2013 | 01 | 2013 | PURCHASE EQUIPMENT INSTEAD OF LEASING | $50,574 | $68,750 | Not Implemented |
OR0619 # 01 Y:2013 | 01 | 2013 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $7,073 | $2,342 | Not Implemented |
OR0619 # 02 Y:2013 | 02 | 2013 | REDUCE FLUID FLOW RATES | $2,879 | $6,200 | Not Implemented |
OR0619 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,300 | $50,000 | Not Implemented |
OR0619 # 04 Y:2013 | 04 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $679 | $1,677 | Not Implemented |
OR0619 # 05 Y:2013 | 05 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,667 | $2,342 | Not Implemented |
OR0619 # 06 Y:2013 | 06 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,550 | $13,225 | Not Implemented |
OR0604 # 02 Y:2013 | 02 | 2013 | IMPROVE COMBUSTION CONTROL CAPABILITY | $144,955 | $110,000 | Not Implemented |
OR0604 # 05 Y:2013 | 05 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $11,228 | $11,850 | Implemented |
OR0604 # 04 Y:2013 | 04 | 2013 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $13,502 | $5,712 | Not Implemented |
OR0604 # 03 Y:2013 | 03 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $53,512 | $43,218 | Not Implemented |
OR0604 # 01 Y:2013 | 01 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,634 | $500 | Implemented |
SF0426 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,979 | $17,191 | Implemented |
SF0426 # 01 Y:2013 | 01 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,719 | $0 | Not Implemented |
SF0426 # 02 Y:2013 | 02 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,686 | $0 | Not Implemented |
SF0426 # 03 Y:2013 | 03 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,403 | $649 | Not Implemented |
SF0426 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,301 | $7,526 | Not Implemented |
SF0426 # 05 Y:2013 | 05 | 2013 | INSTALL OCCUPANCY SENSORS | $373 | $1,619 | Not Implemented |
UA3025 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $38,774 | $8,081 | Implemented |
UA3025 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $26,515 | $2,400 | Not Implemented |
UA3025 # 03 Y:2013 | 03 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $24,911 | $4,000 | Not Implemented |