IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,801

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0868 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,368 $4,750 Implemented
TT0036 # 02 Y:2009 02 2009 DISCONNECT BALLASTS $3,640 $0 Implemented
TT0036 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,980 $2,000 Implemented
TT0036 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,660 $800 Implemented
WV0394 # 02 Y:2009 02 2009 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $22,727 $50,200 Implemented
WV0394 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,978 $19,253 Implemented
WV0394 # 06 Y:2009 06 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,269 $600 Implemented
WV0394 # 08 Y:2009 08 2009 DEVELOP A REPAIR/REPLACE POLICY $3,395 $678 Implemented
WV0394 # 09 Y:2009 09 2009 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,940 $1,000 Implemented
WV0394 # 11 Y:2009 11 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $1,448 $619 Implemented
WV0394 # 13 Y:2009 13 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $998 $0 Implemented
WV0394 # 15 Y:2009 15 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $335 $158 Implemented
TT0039 # 01 Y:2009 01 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,163 $16,183 Implemented
TT0039 # 02 Y:2009 02 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1 $0 Implemented
TT0039 # 03 Y:2009 03 2009 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $77,380 $7,000 Implemented
TT0039 # 04 Y:2009 04 2009 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $36,266 $12,000 Implemented
LL0315 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,024 $4,200 Implemented
LL0315 # 02 Y:2009 02 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,718 $300 Implemented
LL0315 # 05 Y:2009 05 2009 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $193 $1,020 Implemented
SF0377 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,324 $0 Implemented
UM0353 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $186,999 $237,500 Implemented
UM0353 # 02 Y:2009 02 2009 RECOVER WASTE HEAT FROM EQUIPMENT $26,834 $500 Implemented
UM0353 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $22,368 $3,000 Implemented
UM0353 # 06 Y:2009 06 2009 USE OPTIMUM TEMPERATURE $13,085 $200 Implemented
UM0353 # 08 Y:2009 08 2009 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $3,526 $1,500 Implemented