IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

81

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2404 # 07 Y:2024 07 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,858 $17,884 n/a
UC2404 # 01 Y:2024 01 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $17,174 $0 n/a
UC2404 # 04 Y:2024 04 2024 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $15,710 $84,000 n/a
UC2404 # 05 Y:2024 05 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,057 $90 n/a
UC2404 # 02 Y:2024 02 2024 PAY UTILITY BILLS ON TIME $1,575 $0 n/a
UC2404 # 03 Y:2024 03 2024 OPTIMIZE PLANT POWER FACTOR $4,186 $21,381 n/a
UC2404 # 06 Y:2024 06 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $197,215 $1,521,757 n/a
MA0781 # 01 Y:2017 01 2017 USE SOLAR HEAT FOR HEAT $33,144 $405,711 Not Implemented
MA0781 # 05 Y:2017 05 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $285 $215 Implemented
MA0781 # 04 Y:2017 04 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,734 $2,724 Implemented
MA0781 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $7,386 $6,000 Not Implemented
MA0781 # 03 Y:2017 03 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,896 $61,500 Not Implemented
MA0767 # 06 Y:2016 06 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $361 $274 Implemented
MA0767 # 03 Y:2016 03 2016 REDUCE VENTILATION AIR $7,620 $3,955 Implemented
MA0767 # 05 Y:2016 05 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $461 $157 Implemented
MA0767 # 01 Y:2016 01 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $30,841 $74,750 Not Implemented
MA0767 # 02 Y:2016 02 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,408 $15,090 Not Implemented
MA0767 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $911 $3,330 Implemented
MA0744 # 06 Y:2015 06 2015 REDUCE VENTILATION AIR $2,077 $500 Not Implemented
MA0744 # 05 Y:2015 05 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,753 $3,460 Not Implemented
MA0744 # 02 Y:2015 02 2015 OPTIMIZE PLANT POWER FACTOR $8,840 $12,155 Implemented
MA0744 # 03 Y:2015 03 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,413 $39,000 Not Implemented
MA0744 # 01 Y:2015 01 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,197 $27,500 Not Implemented
MA0744 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,325 $1,800 Implemented
MA0740 # 05 Y:2015 05 2015 REDUCE VENTILATION AIR $3,084 $2,450 Implemented