IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,763

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0192 # 09 Y:2017 09 2017 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,309 $10,000 Not Implemented
TT0192 # 10 Y:2017 10 2017 DEVELOP A REPAIR/REPLACE POLICY $796 $1,453 Not Implemented
UA0177 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,201 $1,265 Implemented
UA0177 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $999 $500 Not Implemented
UA0177 # 03 Y:2017 03 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,275 $480 Implemented
UF0504 # 01 Y:2017 01 2017 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $12,636 $39,000 Not Implemented
UF0504 # 02 Y:2017 02 2017 ADD AREA LIGHTING SWITCHES $2,381 $2,240 Not Implemented
UF0504 # 03 Y:2017 03 2017 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $1,236 $700 Not Implemented
UF0504 # 04 Y:2017 04 2017 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $352,554 $180,000 Not Implemented
UF0504 # 05 Y:2017 05 2017 INSTALL AN UNINTERUPTABLE POWER SUPPLY $15,187 $28,820 Not Implemented
UF0504 # 06 Y:2017 06 2017 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $9,360 $3,600 Not Implemented
MZ0221 # 01 Y:2017 01 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,101 $1,160 Implemented
MZ0221 # 02 Y:2017 02 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,200 $0 Implemented
MZ0221 # 03 Y:2017 03 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,574 $100 Implemented
MZ0221 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $1,286 $2,350 Implemented
MZ0221 # 05 Y:2017 05 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,974 $0 Implemented
UA0174 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $435,778 $988,290 Not Implemented
UA0174 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $21,405 $588 Implemented
UA0174 # 03 Y:2017 03 2017 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $49,747 $100,000 Not Implemented
UA0174 # 04 Y:2017 04 2017 INSULATE BARE EQUIPMENT $221 $564 Implemented
UA0174 # 05 Y:2017 05 2017 USE OPTIMUM TEMPERATURE $33,738 $8,460 Implemented
UA0174 # 06 Y:2017 06 2017 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $826 $2,820 Implemented
UA0174 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,033 $42,204 Not Implemented
UK1612 # 01 Y:2017 01 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $22,720 $38,000 Not Implemented
UK1612 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,900 $0 Not Implemented