IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,763

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0485 # 09 Y:2016 09 2016 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $82,425 $18,000 Not Implemented
LE0418 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,199 $0 Implemented
LE0418 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $60,481 $15,000 Not Implemented
LE0418 # 03 Y:2016 03 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $317,839 $125,000 Implemented
LE0418 # 04 Y:2016 04 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,759 $6,000 Implemented
LE0418 # 05 Y:2016 05 2016 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $1,116,268 $1,540,000 Implemented
LE0418 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,905 $12,000 Implemented
LE0418 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,745 $13,000 Not Implemented
LE0418 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,764 $11,250 Not Implemented
LE0418 # 09 Y:2016 09 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $26,015 $127,400 Implemented
TT0172 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,170 $114,000 Not Implemented
TT0172 # 02 Y:2016 02 2016 INSTALL TIMERS AND/OR THERMOSTATS $27,275 $393 Not Implemented
TT0172 # 03 Y:2016 03 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,196 $25,500 Not Implemented
TT0172 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,632 $2,000 Not Implemented
TT0172 # 05 Y:2016 05 2016 INSTALL TIMERS AND/OR THERMOSTATS $2,023 $1,000 Not Implemented
TT0172 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,611 $3,000 Not Implemented
MI0297 # 01 Y:2016 01 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $97,105 $82,600 Not Implemented
MI0297 # 02 Y:2016 02 2016 UTILIZE A LESS EXPENSIVE COOLING METHOD $65,063 $200,000 Not Implemented
MI0297 # 03 Y:2016 03 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $40,957 $1,120 Not Implemented
MI0297 # 04 Y:2016 04 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $27,925 $1,400 Not Implemented
MI0297 # 05 Y:2016 05 2016 RECOVER WASTE HEAT FROM EQUIPMENT $23,144 $7,000 Implemented
MI0297 # 06 Y:2016 06 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $21,747 $40 Not Implemented
MI0297 # 07 Y:2016 07 2016 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $21,352 $22,281 Implemented
MI0297 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,133 $1,660 Implemented
MI0297 # 09 Y:2016 09 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $9,631 $16,156 Not Implemented