IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

777

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0939 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,740 $1,000 Implemented
UD0939 # 06 Y:2016 06 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $164 $375 Implemented
UD0939 # 07 Y:2016 07 2016 INSTALL OCCUPANCY SENSORS $1,588 $1,013 Implemented
UD0939 # 08 Y:2016 08 2016 INSTALL SPECTRAL REFLECTORS / DELAMP $1,699 $315 Implemented
UD0939 # 09 Y:2016 09 2016 COVER OPEN TANKS $1,526 $740 Not Implemented
UD0939 # 10 Y:2016 10 2016 COVER OPEN TANKS $612 $600 Not Implemented
UD0939 # 11 Y:2016 11 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,321 $6,500 Not Implemented
UD0936 # 01 Y:2015 01 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,695 $0 Implemented
UD0936 # 02 Y:2015 02 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $22,431 $2,260 Implemented
UD0936 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $17,704 $6,000 Not Implemented
UD0936 # 04 Y:2015 04 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,661 $825 Not Implemented
UD0936 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,521 $1,000 Implemented
UD0936 # 06 Y:2015 06 2015 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $39,316 $29,746 Not Implemented
UD0936 # 07 Y:2015 07 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $530 $1,480 Implemented
UD0936 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,271 $85,000 Implemented
UD0936 # 09 Y:2015 09 2015 INSTALL OCCUPANCY SENSORS $4,331 $6,300 Not Implemented
UD0933 # 01 Y:2015 01 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,290 $0 Not Implemented
UD0933 # 02 Y:2015 02 2015 RECOVER WASTE HEAT FROM EQUIPMENT $36,526 $9,600 Not Implemented
UD0933 # 03 Y:2015 03 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,840 $0 Implemented
UD0933 # 04 Y:2015 04 2015 COVER OPEN TANKS $1,716 $200 Not Implemented
UD0933 # 05 Y:2015 05 2015 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,075 $0 Implemented
UD0933 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,155 $2,950 Not Implemented
UD0933 # 07 Y:2015 07 2015 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $15,649 $200 Not Implemented
UD0933 # 08 Y:2015 08 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,264 $10,000 Not Implemented
UD0933 # 09 Y:2015 09 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $52,874 $48,825 Not Implemented