IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,773

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1401 # 06 Y:2014 06 2014 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,590 $7,550 Not Implemented
UK1401 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $2,274 $860 Not Implemented
UK1401 # 08 Y:2014 08 2014 OPTIMIZE PLANT POWER FACTOR $1,337 $2,135 Not Implemented
UK1401 # 09 Y:2014 09 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $689 $840 Not Implemented
UK1401 # 10 Y:2014 10 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,297 $0 Not Implemented
UK1401 # 11 Y:2014 11 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,087 $700 Not Implemented
UK1401 # 12 Y:2014 12 2014 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $666 $86 Not Implemented
UK1401 # 13 Y:2014 13 2014 USE PHOTOCELL CONTROLS $249 $222 Not Implemented
UK1401 # 14 Y:2014 14 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $53 $65 Not Implemented
UK1401 # 15 Y:2014 15 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $68 $0 Not Implemented
UK1401 # 16 Y:2014 16 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $79 $0 Not Implemented
UA0117 # 01 Y:2014 01 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $116,327 $120 Not Implemented
UA0117 # 02 Y:2014 02 2014 RECOVER WASTE HEAT FROM EQUIPMENT $2,244 $3,515 Not Implemented
UA0117 # 03 Y:2014 03 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $14,760 $21,000 Implemented
UA0117 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $4,219 $1,139 Not Implemented
UA0117 # 05 Y:2014 05 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,571 $7,675 Not Implemented
UA0117 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,971 $800 Not Implemented
UA0117 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,033 $1,900 Not Implemented
BS0030 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,042 $1,697 Implemented
BS0030 # 02 Y:2014 02 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,268 $11,600 Not Implemented
BS0030 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,073 $23,840 Not Implemented
BS0030 # 04 Y:2014 04 2014 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $2,459 $2,500 Not Implemented
MA0726 # 01 Y:2014 01 2014 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT $25,418 $110,000 Not Implemented
MA0726 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $3,232 $500 Not Implemented
MA0726 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,119 $5,375 Not Implemented