Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,773
matching recommendationsNAICS | 336 | Transportation Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0726 # 04 Y:2014 | 04 | 2014 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $608 | $500 | Implemented |
SD0479 # 01 Y:2014 | 01 | 2014 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $360,753 | $1,272,000 | Not Implemented |
SD0479 # 02 Y:2014 | 02 | 2014 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $67,610 | $30,440 | Not Implemented |
SD0479 # 03 Y:2014 | 03 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $45,591 | $59,600 | Implemented |
SD0479 # 04 Y:2014 | 04 | 2014 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $28,012 | $38,000 | Not Implemented |
SD0479 # 05 Y:2014 | 05 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,299 | $21,315 | Implemented |
SD0479 # 06 Y:2014 | 06 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,525 | $2,865 | Not Implemented |
MZ0137 # 01 Y:2014 | 01 | 2014 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,036 | $0 | Not Implemented |
MZ0137 # 02 Y:2014 | 02 | 2014 | INSTALL OCCUPANCY SENSORS | $1,989 | $1,920 | Implemented |
MZ0137 # 03 Y:2014 | 03 | 2014 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $856 | $2,050 | Implemented |
MZ0137 # 04 Y:2014 | 04 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $16,610 | $0 | Implemented |
MZ0137 # 05 Y:2014 | 05 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $805 | $1,475 | Implemented |
MZ0137 # 06 Y:2014 | 06 | 2014 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $8,378 | $0 | Implemented |
MZ0137 # 07 Y:2014 | 07 | 2014 | AIR CONDITION ONLY SPACE NECESSARY | $4,215 | $0 | Not Implemented |
MZ0137 # 08 Y:2014 | 08 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,678 | $7,200 | Not Implemented |
WM0041 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,140 | $2,510 | Implemented |
WM0041 # 02 Y:2014 | 02 | 2014 | INSTALL OCCUPANCY SENSORS | $330 | $100 | Implemented |
WM0041 # 03 Y:2014 | 03 | 2014 | USE HEAT PUMP FOR SPACE CONDITIONING | $6,061 | $28,350 | Not Implemented |
WM0041 # 04 Y:2014 | 04 | 2014 | USE SYNTHETIC LUBRICANT | $2,025 | $868 | Not Implemented |
WM0041 # 05 Y:2014 | 05 | 2014 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,016 | $7,200 | Implemented |
SU0359 # 01 Y:2014 | 01 | 2014 | INSULATE FEEDWATER TANK | $1,037 | $137 | Implemented |
SU0359 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,651 | $1,900 | Implemented |
SU0359 # 03 Y:2014 | 03 | 2014 | INSTALL OCCUPANCY SENSORS | $1,346 | $470 | Implemented |
SU0359 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $931 | $855 | Implemented |
SU0359 # 05 Y:2014 | 05 | 2014 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $78,976 | $119,000 | Not Implemented |