Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,773
matching recommendationsNAICS | 336 | Transportation Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0889 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,401 | $9,000 | Not Implemented |
UD0889 # 08 Y:2013 | 08 | 2013 | INSTALL OCCUPANCY SENSORS | $1,290 | $1,400 | Not Implemented |
BS0022 # 01 Y:2013 | 01 | 2013 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $3,444 | $500 | Implemented |
BS0022 # 02 Y:2013 | 02 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,989 | $218 | Implemented |
BS0022 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,022 | $26,934 | Not Implemented |
BS0022 # 04 Y:2013 | 04 | 2013 | COVER OPEN TANKS | $418 | $310 | Not Implemented |
BS0022 # 05 Y:2013 | 05 | 2013 | REPAIR AND ELIMINATE STEAM LEAKS | $1,748 | $697 | Implemented |
BS0022 # 06 Y:2013 | 06 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $871 | $15 | Implemented |
IA0508 # 01 Y:2013 | 01 | 2013 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $218,077 | $1,045,200 | Not Implemented |
IA0508 # 02 Y:2013 | 02 | 2013 | REPAIR OR REPLACE STEAM TRAPS | $14,349 | $3,750 | Implemented |
IA0508 # 03 Y:2013 | 03 | 2013 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $2,845 | $1,000 | Implemented |
IA0508 # 04 Y:2013 | 04 | 2013 | OPTIMIZE PLANT POWER FACTOR | $6,113 | $6,000 | Implemented |
IA0508 # 05 Y:2013 | 05 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $689 | $1,590 | Implemented |
IA0508 # 06 Y:2013 | 06 | 2013 | INSTALL OCCUPANCY SENSORS | $6,734 | $5,775 | Not Implemented |
IA0508 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $598 | $394 | Not Implemented |
IA0508 # 08 Y:2013 | 08 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,512 | $1,000 | Implemented |
IA0508 # 09 Y:2013 | 09 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,758 | $976 | Implemented |
IA0508 # 10 Y:2013 | 10 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,022 | $210 | Not Implemented |
WM0030 # 01 Y:2013 | 01 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,439 | $1,853 | Not Implemented |
WM0030 # 02 Y:2013 | 02 | 2013 | USE RADIANT HEATER FOR SPOT HEATING | $17,111 | $9,180 | Not Implemented |
WM0030 # 03 Y:2013 | 03 | 2013 | USE PHOTOCELL CONTROLS | $2,234 | $4,550 | Not Implemented |
WM0030 # 04 Y:2013 | 04 | 2013 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,570 | $500 | Not Implemented |
WM0030 # 05 Y:2013 | 05 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,064 | $0 | Not Implemented |
WM0030 # 06 Y:2013 | 06 | 2013 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $34,398 | $69,000 | Implemented |
WM0030 # 07 Y:2013 | 07 | 2013 | MODIFY STARTUP/SHUTDOWN TIMES | $3,034 | $0 | Not Implemented |