IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,773

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0097 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $63,167 $106,204 Implemented
UA0086 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,086 $29,396 Implemented
UA0086 # 02 Y:2012 02 2012 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $7,370 $1,353 Implemented
UA0086 # 03 Y:2012 03 2012 INSTALL TIMERS AND/OR THERMOSTATS $7,367 $2,548 Not Implemented
UA0086 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,694 $800 Not Implemented
UA0086 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,645 $2,200 Implemented
UA0086 # 06 Y:2012 06 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $481 $613 Implemented
UA0086 # 07 Y:2012 07 2012 RECOVER WASTE HEAT FROM EQUIPMENT $8,174 $30,000 Not Implemented
UM0410 # 01 Y:2012 01 2012 OPTIMIZE PLANT POWER FACTOR $7,109 $20,000 Not Implemented
UM0410 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,453 $11,580 Not Implemented
UM0410 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,779 $100 Implemented
UM0410 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,438 $2,000 Not Implemented
UM0410 # 05 Y:2012 05 2012 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $682 $10 Not Implemented
BS0007 # 01 Y:2012 01 2012 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,790 $4,911 Not Implemented
BS0007 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,760 $649 Implemented
BS0007 # 03 Y:2012 03 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $98 $0 Not Implemented
BS0007 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $186 $300 Not Implemented
BS0007 # 05 Y:2012 05 2012 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,845 $6,260 Not Implemented
BS0007 # 06 Y:2012 06 2012 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,204 $7,725 Not Implemented
NC0459 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,477 $67,898 Implemented
NC0459 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,453 $152,640 Implemented
NC0459 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,925 $8,552 Implemented
NC0459 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,710 $4,085 Not Implemented
NC0459 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,052 $1,980 Not Implemented
NC0459 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,036 $624 Not Implemented