IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,763

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0400 # 02 Y:2012 02 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $15,755 $17,500 Not Implemented
UM0400 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,437 $4,000 Not Implemented
UM0400 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,410 $200 Not Implemented
UM0400 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $3,287 $5,040 Not Implemented
UM0400 # 06 Y:2012 06 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $706 $10 Not Implemented
UM0400 # 07 Y:2012 07 2012 RECOVER WASTE HEAT FROM EQUIPMENT $3,660 $4,000 Not Implemented
UM0400 # 08 Y:2012 08 2012 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $1,447 $4,000 Not Implemented
BD0412 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,670 $30,287 Not Implemented
BD0412 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,041 $6,000 Not Implemented
BD0412 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $4,980 $1,050 Not Implemented
BD0412 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,859 $20 Not Implemented
BD0412 # 05 Y:2012 05 2012 USE SYNTHETIC LUBRICANT $4,093 $1,200 Not Implemented
BD0412 # 06 Y:2012 06 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,988 $2,000 Not Implemented
BD0412 # 07 Y:2012 07 2012 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $798 $40 Not Implemented
SU0319 # 01 Y:2012 01 2012 USE SYNTHETIC LUBRICANT $167 $0 Not Implemented
SU0319 # 02 Y:2012 02 2012 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $17 $0 Not Implemented
SU0319 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,648 $1,000 Not Implemented
SU0319 # 04 Y:2012 04 2012 ELIMINATE/REDUCE AN OPERATION $24,117 $15,840 Implemented
SU0319 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,410 $2,500 Implemented
SU0319 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,147 $1,075 Implemented
SU0319 # 07 Y:2012 07 2012 RECOVER WASTE HEAT FROM EQUIPMENT $250,480 $603,880 Implemented
SU0319 # 08 Y:2012 08 2012 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $503 $1,805 Not Implemented
SU0319 # 09 Y:2012 09 2012 OPTIMIZE PLANT POWER FACTOR $21,253 $79,288 Not Implemented
UA0078 # 01 Y:2012 01 2012 BURN A LESS EXPENSIVE GRADE OF FUEL $217,328 $9,277 Not Implemented
UA0078 # 02 Y:2012 02 2012 OPTIMIZE PLANT POWER FACTOR $59,117 $13,031 Not Implemented