IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,754

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0648 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $113,272 $30,051 Implemented
SD0648 # 05 Y:2024 05 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $824,443 $529,751 Not Implemented
SD0648 # 06 Y:2024 06 2024 USE BATTERY STORAGE FOR DEMAND CONTROL $409,025 $0 Not Implemented
SD0648 # 07 Y:2024 07 2024 INSTALL TIMERS AND/OR THERMOSTATS $35,974 $2,600 Implemented
SD0648 # 08 Y:2024 08 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,384 $2,234 Implemented
SD0648 # 09 Y:2024 09 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $364,878 $49,250 Not Implemented
SD0648 # 10 Y:2024 10 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,121 $10,016 Implemented
SD0648 # 11 Y:2024 11 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,340 $15,608 Implemented
SD0648 # 12 Y:2024 12 2024 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $982,749 $783,575 Not Implemented
SD0648 # 13 Y:2024 13 2024 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $793 $1,336 Implemented
UW2319 # 01 Y:2023 01 2023 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $56,470 $23,651 Not Implemented
UW2319 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,837 $2,080 Not Implemented
UW2319 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $1,001 $2,820 Not Implemented
UW2319 # 04 Y:2023 04 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $11,443 $68,000 Not Implemented
UW2319 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,789 $3,000 Not Implemented
UW2319 # 06 Y:2023 06 2023 USER BATTERY STORAGE FOR POWER QUALITY ISSUES $750,000 $871,000 Not Implemented
UA0281 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $18,036 $12,615 n/a
UA0281 # 02 Y:2023 02 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $14,808 $5,698 n/a
UA0281 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,375 $1,000 n/a
UA0281 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,484 $8,591 n/a
UA0281 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $56,035 $68,083 n/a
UA0281 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $6,060 $1,885 n/a
UA0281 # 07 Y:2023 07 2023 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,437 $26,750 n/a
UA0281 # 08 Y:2023 08 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $21,490 $49,464 n/a
UA0281 # 09 Y:2023 09 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $40,483 $47,040 n/a