IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,763

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0071 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,723 $640 Not Implemented
UA0071 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,016 $3,900 Not Implemented
UA0071 # 06 Y:2011 06 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $20,451 $66,050 Not Implemented
UA0071 # 07 Y:2011 07 2011 RECOVER WASTE HEAT FROM EQUIPMENT $22,837 $1,752 Not Implemented
UA0069 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,023 $800 Not Implemented
UA0069 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,441 $800 Not Implemented
UA0069 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,126 $1,300 Not Implemented
UA0069 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,916 $3,200 Not Implemented
UA0069 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $678 $2,578 Not Implemented
UA0069 # 06 Y:2011 06 2011 USE OPTIMUM THICKNESS INSULATION $25,829 $16,900 Not Implemented
UA0069 # 07 Y:2011 07 2011 USE OPTIMUM THICKNESS INSULATION $5,314 $1,750 Not Implemented
UA0069 # 08 Y:2011 08 2011 USE OPTIMUM THICKNESS INSULATION $6,558 $7,600 Not Implemented
UA0069 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,865 $24,690 Implemented
UA0069 # 10 Y:2011 10 2011 INSTALL OCCUPANCY SENSORS $596 $398 Not Implemented
MS0384 # 01 Y:2011 01 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $6,041 $1,900 Not Implemented
MS0384 # 02 Y:2011 02 2011 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $3,680 $611 Not Implemented
MS0384 # 03 Y:2011 03 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,101 $13,781 Not Implemented
UM0396 # 01 Y:2011 01 2011 UPGRADE CONTROLS ON COMPRESSORS $3,985 $2,500 Not Implemented
TT0079 # 01 Y:2011 01 2011 DISCONNECT BALLASTS $508 $0 Implemented
TT0079 # 02 Y:2011 02 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $336 $0 Implemented
TT0079 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $205 $0 Implemented
TT0079 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $1,618 $0 Not Implemented
TT0079 # 05 Y:2011 05 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $631 $0 Not Implemented
TT0079 # 06 Y:2011 06 2011 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,937 $0 Implemented
TT0079 # 07 Y:2011 07 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,691 $0 Not Implemented