IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,763

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0392 # 11 Y:2011 11 2011 RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION $67,284 $10 Not Implemented
BD0392 # 12 Y:2011 12 2011 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $12,800 $1,600 Implemented
UA0060 # 01 Y:2011 01 2011 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $10,956 $34,000 Not Implemented
UA0060 # 02 Y:2011 02 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $804 $2,040 Not Implemented
UA0060 # 03 Y:2011 03 2011 AIR CONDITION ONLY SPACE NECESSARY $20,888 $14,995 Not Implemented
BD0390 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,012 $21,240 Implemented
BD0390 # 02 Y:2011 02 2011 INSTALL TURBULATORS $2,436 $2,500 Implemented
BD0390 # 03 Y:2011 03 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,595 $4,000 Implemented
BD0390 # 04 Y:2011 04 2011 USE SYNTHETIC LUBRICANT $453 $300 Not Implemented
BD0390 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $272 $500 Implemented
BD0390 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $434 $237 Implemented
BD0390 # 07 Y:2011 07 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $145 $510 Not Implemented
UA0059 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,193 $640 Implemented
UA0059 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,648 $2,500 Implemented
UA0059 # 03 Y:2011 03 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $68,973 $399,000 Not Implemented
UA0059 # 04 Y:2011 04 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,673 $29,278 Not Implemented
UA0059 # 05 Y:2011 05 2011 USE RADIANT HEATER FOR SPOT HEATING $10,002 $14,840 Not Implemented
UA0059 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $2,017 $2,280 Not Implemented
UA0059 # 07 Y:2011 07 2011 DISCONNECT BALLASTS $3,883 $2,310 Not Implemented
UD0835 # 01 Y:2011 01 2011 USE SOLAR HEAT TO MAKE ELECTRICTY $21,722 $145,390 Not Implemented
UD0835 # 02 Y:2011 02 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $305 $25 Implemented
UD0835 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,411 $200 Not Implemented
UD0835 # 04 Y:2011 04 2011 RECOVER WASTE HEAT FROM EQUIPMENT $2,430 $11,500 Not Implemented
UD0835 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,571 $40,131 Not Implemented
UD0835 # 06 Y:2011 06 2011 REPLACE BOILER $15,607 $52,190 Not Implemented