IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,763

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA3005 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,085 $42,861 Implemented
UA3005 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $2,974 $730 Not Implemented
UA3005 # 04 Y:2010 04 2010 UPGRADE CONTROLS ON COMPRESSORS $9,502 $20,000 Implemented
UA3005 # 05 Y:2010 05 2010 RECOVER WASTE HEAT FROM EQUIPMENT $9,061 $5,448 Not Implemented
UA3005 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,840 $400 Not Implemented
UA3005 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,333 $1,000 Not Implemented
UA3005 # 08 Y:2010 08 2010 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $122,417 $2,400 Implemented
UA3005 # 09 Y:2010 09 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $6,056 $2,750 Not Implemented
UA3005 # 10 Y:2010 10 2010 INSTALL TIMERS AND/OR THERMOSTATS $2,972 $510 Not Implemented
UM0375 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $126,231 $236,764 Implemented
UM0375 # 02 Y:2010 02 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $16,709 $4,000 Implemented
UM0375 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $7,646 $4,232 Implemented
UM0375 # 04 Y:2010 04 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $27,796 $140,490 Implemented
UM0375 # 05 Y:2010 05 2010 RECOVER WASTE HEAT FROM EQUIPMENT $16,802 $5,500 Implemented
CO0644 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,520 $1,000 Implemented
CO0644 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,750 $1,000 Implemented
CO0644 # 03 Y:2010 03 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,030 $35,000 Implemented
CO0644 # 04 Y:2010 04 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,750 $15,000 Implemented
CO0644 # 05 Y:2010 05 2010 USE SOLAR HEAT TO MAKE ELECTRICTY $2,500 $27,500 Not Implemented
CO0644 # 06 Y:2010 06 2010 REDUCE VENTILATION AIR $1,390 $12,400 Implemented
MI0196 # 01 Y:2010 01 2010 UTILIZE A LESS EXPENSIVE COOLING METHOD $157,910 $102,500 Implemented
MI0196 # 02 Y:2010 02 2010 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $113,486 $143,892 Not Implemented
MI0196 # 03 Y:2010 03 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $108,082 $2,000 Implemented
MI0196 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,243 $1,210 Implemented
MI0196 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,467 $40 Not Implemented