IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,754

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0737 # 03 Y:2006 03 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,201 $0 Not Implemented
UD0737 # 04 Y:2006 04 2006 UPGRADE CONTROLS ON COMPRESSORS $7,933 $1,436 Not Implemented
UD0737 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,592 $15,876 Not Implemented
UD0737 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,404 $0 Not Implemented
UD0737 # 07 Y:2006 07 2006 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $3,177 $387 Not Implemented
UD0737 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,238 $6,552 Implemented
UD0737 # 09 Y:2006 09 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,074 $0 Not Implemented
UD0737 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,120 $0 Not Implemented
UD0737 # 11 Y:2006 11 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $419 $1,968 Not Implemented
UD0737 # 12 Y:2006 12 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $199 $0 Not Implemented
AS0416 # 01 Y:2006 01 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $31,751 $36,000 Not Implemented
AS0416 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,872 $34,827 Implemented
AS0416 # 03 Y:2006 03 2006 PAY BILLS ON TIME TO AVOID LATE FEES $3,096 $0 Implemented
AS0416 # 04 Y:2006 04 2006 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $1,237 $0 Not Implemented
AS0416 # 05 Y:2006 05 2006 USE SOLAR HEAT TO HEAT WATER $345 $2,050 Not Implemented
UM0297 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $8,060 $2,000 Not Implemented
UM0297 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $6,448 $9,089 Not Implemented
UM0297 # 03 Y:2006 03 2006 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $6,156 $3,450 Implemented
UM0297 # 04 Y:2006 04 2006 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $5,502 $3,900 Not Implemented
UM0297 # 05 Y:2006 05 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,020 $872 Implemented
UM0297 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,215 $6,601 Implemented
MS0289 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,615 $42,772 Not Implemented
MS0289 # 02 Y:2006 02 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,962 $54 Not Implemented
MS0289 # 03 Y:2006 03 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,395 $100 Not Implemented
MS0289 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,133 $2,724 Not Implemented