IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,456

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0226 # 11 Y:2003 11 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,004 $2,200 Not Implemented
UM0226 # 12 Y:2003 12 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $164 $0 Not Implemented
OK0655 # 01 Y:2003 01 2003 INSTALL SET-BACK TIMERS $21,416 $543 Not Implemented
OK0655 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,168 $1,300 Not Implemented
OK0655 # 03 Y:2003 03 2003 REPLACE BOILER $45,804 $53,815 n/a
OK0655 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $38,818 $30,499 Not Implemented
OK0655 # 05 Y:2003 05 2003 PREHEAT COMBUSTION AIR WITH WASTE HEAT $5,749 $25,000 Not Implemented
UM0225 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,181 $750 Not Implemented
UM0225 # 02 Y:2003 02 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,809 $5,500 Not Implemented
UM0225 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,040 $6,081 Not Implemented
UM0225 # 04 Y:2003 04 2003 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,500 $4,000 Not Implemented
UM0225 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $80 $0 Not Implemented
SD0312 # 01 Y:2003 01 2003 USE PHOTOCELL CONTROLS $16,275 $11,000 Not Implemented
SD0312 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,368 $0 Not Implemented
SD0312 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,675 $400 Not Implemented
SD0312 # 04 Y:2003 04 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $781 $0 Implemented
SD0312 # 05 Y:2003 05 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,500 $10,000 Not Implemented
IA0310 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,362 $29,292 Not Implemented
IA0310 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,338 $5,828 Implemented
IA0310 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $214 $266 Implemented
IA0310 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $807 $25 Not Implemented
IA0310 # 05 Y:2003 05 2003 USE DEMAND CONTROLLER OR LOAD SHEDDER $12,468 $7,349 Implemented
IA0310 # 06 Y:2003 06 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $204 $0 Implemented
IA0310 # 07 Y:2003 07 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $523 $0 Implemented
IA0310 # 08 Y:2003 08 2003 ADJUST BURNERS FOR EFFICIENT OPERATION $2,267 $1,000 Not Implemented