IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

293

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0171 # 01 Y:2023 01 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,033 $0 Not Implemented
IP0171 # 02 Y:2023 02 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $18,240 $0 Not Implemented
IP0171 # 03 Y:2023 03 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,706 $517 Not Implemented
IP0171 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,539 $915 Not Implemented
IP0171 # 06 Y:2023 06 2023 RECOVER WASTE HEAT FROM EQUIPMENT $4,171 $1,316 Not Implemented
IP0171 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $44,840 $69,000 Not Implemented
IP0171 # 08 Y:2023 08 2023 INSTALL OCCUPANCY SENSORS $117 $499 Not Implemented
IP0171 # 09 Y:2023 09 2023 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $128 $600 Not Implemented
IP0167 # 01 Y:2022 01 2022 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $17,520 $2,500 Not Implemented
IP0167 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,801 $3,457 Implemented
IP0167 # 03 Y:2022 03 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,573 $475 Implemented
IP0167 # 04 Y:2022 04 2022 AIR CONDITION ONLY SPACE NECESSARY $6,333 $2,520 Implemented
IP0167 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,306 $3,300 Not Implemented
IP0167 # 06 Y:2022 06 2022 RECOVER WASTE HEAT FROM EQUIPMENT $1,236 $2,330 Not Implemented
IP0167 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $369 $730 Not Implemented
IP0167 # 08 Y:2022 08 2022 USE RADIANT HEATER FOR SPOT HEATING $10,286 $21,879 Not Implemented
IP0167 # 09 Y:2022 09 2022 OPTIMIZE PLANT POWER FACTOR $11,341 $26,639 Implemented
IP0167 # 10 Y:2022 10 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,565 $8,140 Implemented
IP0163 # 09 Y:2022 09 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $640 $674 Implemented
IP0163 # 10 Y:2022 10 2022 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $4,458 $8,975 Not Implemented
IP0163 # 02 Y:2022 02 2022 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $24,564 $0 Not Implemented
IP0163 # 04 Y:2022 04 2022 USE PHOTOCELL CONTROLS $2,682 $248 Implemented
IP0163 # 03 Y:2022 03 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,306 $3 Implemented
IP0163 # 08 Y:2022 08 2022 RECOVER WASTE HEAT FROM EQUIPMENT $2,345 $2,259 Implemented
IP0163 # 01 Y:2022 01 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $241 $0 Implemented