Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,754
matching recommendationsNAICS | 336 | Transportation Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0597 # 01 Y:2023 | 01 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,268 | $0 | Implemented |
SF0597 # 02 Y:2023 | 02 | 2023 | ADD AREA LIGHTING SWITCHES | $11,388 | $100 | Implemented |
SF0597 # 03 Y:2023 | 03 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $53,882 | $13,192 | Implemented |
SF0597 # 04 Y:2023 | 04 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $706 | $200 | Not Implemented |
SF0597 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $322,164 | $2,251,041 | Implemented |
NT0001 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,144 | $5,801 | Implemented |
NT0001 # 02 Y:2023 | 02 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $16,452 | $9,984 | Implemented |
NT0001 # 03 Y:2023 | 03 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,130 | $1,258 | Implemented |
NT0001 # 04 Y:2023 | 04 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $19,448 | $9,020 | Not Implemented |
NT0001 # 05 Y:2023 | 05 | 2023 | INSTALL SET-BACK TIMERS | $883 | $0 | Implemented |
NT0001 # 06 Y:2023 | 06 | 2023 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $2,710 | $0 | Implemented |
NT0001 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,707 | $6,472 | Implemented |
TT0293 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,707 | $1,500 | Implemented |
TT0293 # 02 Y:2023 | 02 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $10,120 | $0 | Implemented |
TT0293 # 03 Y:2023 | 03 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $7,910 | $600 | Implemented |
TT0293 # 04 Y:2023 | 04 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,615 | $31,320 | Implemented |
TT0293 # 05 Y:2023 | 05 | 2023 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $3,025 | $10,040 | Not Implemented |
TT0293 # 06 Y:2023 | 06 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,199 | $0 | Implemented |
TT0293 # 07 Y:2023 | 07 | 2023 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $923 | $1,600 | Implemented |
TT0293 # 08 Y:2023 | 08 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $736 | $170 | Implemented |
TT0293 # 09 Y:2023 | 09 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $630 | $2,000 | Implemented |
AS0541 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $116,802 | $60,350 | Not Implemented |
AS0541 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,906 | $8,806 | Not Implemented |
AS0541 # 03 Y:2022 | 03 | 2022 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $357 | $826 | Not Implemented |
AS0541 # 04 Y:2022 | 04 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $253 | $1,056 | Not Implemented |