Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
254
matching recommendationsNAICS | 336 | Transportation Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0742 # 04 Y:2018 | 04 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $880 | $5 | Implemented |
AM0742 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $670 | $1,200 | Not Implemented |
TR0005 # 11 Y:2017 | 11 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,882 | $25,954 | Implemented |
TR0005 # 01 Y:2017 | 01 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $4,452 | $6,500 | Implemented |
TR0005 # 02 Y:2017 | 02 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $1,056 | $417 | Not Implemented |
TR0005 # 03 Y:2017 | 03 | 2017 | CHANGE METHOD OF DEIONIZED WATER PRODUCTION | $258,000 | $292,000 | Implemented |
TR0005 # 04 Y:2017 | 04 | 2017 | METER WASTE WATER | $11,708 | $2,650 | Implemented |
TR0005 # 05 Y:2017 | 05 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $15,338 | $56,000 | Implemented |
TR0005 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,836 | $8,821 | Implemented |
TR0005 # 08 Y:2017 | 08 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $287 | $494 | Implemented |
TR0005 # 09 Y:2017 | 09 | 2017 | ISOLATE HOT OR COLD EQUIPMENT | $292 | $1,422 | Not Implemented |
TR0005 # 10 Y:2017 | 10 | 2017 | ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS | $8,320 | $966 | Implemented |
TR0005 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $223 | $399 | Implemented |
TR0006 # 07 Y:2017 | 07 | 2017 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $11,119 | $3,360 | n/a |
TR0006 # 06 Y:2017 | 06 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $117,470 | $11,908 | n/a |
TR0006 # 05 Y:2017 | 05 | 2017 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $4,005 | $208 | n/a |
TR0006 # 04 Y:2017 | 04 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $31,644 | $0 | n/a |
TR0006 # 03 Y:2017 | 03 | 2017 | INSULATE BARE EQUIPMENT | $5,324 | $88 | n/a |
TR0006 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $271 | $279 | n/a |
TR0006 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,038 | $21,816 | n/a |
TR0006 # 08 Y:2017 | 08 | 2017 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $23,655 | $0 | n/a |
TR0003 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $32,843 | $2,000 | Implemented |
TR0003 # 06 Y:2017 | 06 | 2017 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $14,265 | $449 | Not Implemented |
TR0003 # 07 Y:2017 | 07 | 2017 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $10,954 | $10,000 | Implemented |
TR0003 # 03 Y:2017 | 03 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,334 | $14,764 | Not Implemented |