Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,754
matching recommendationsNAICS | 336 | Transportation Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0176 # 04 Y:2021 | 04 | 2021 | OPTIMIZE PLANT POWER FACTOR | $23,470 | $21,270 | Not Implemented |
UU0176 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,766 | $7,600 | Implemented |
UU0176 # 06 Y:2021 | 06 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,012 | $22,700 | Not Implemented |
UU0176 # 07 Y:2021 | 07 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,411 | $5,700 | Implemented |
LS2007 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,423 | $150 | Not Implemented |
LS2007 # 02 Y:2020 | 02 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $67,360 | $13,000 | Not Implemented |
LS2007 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,236 | $1,080 | Not Implemented |
LS2007 # 04 Y:2020 | 04 | 2020 | INSTALL OCCUPANCY SENSORS | $1,978 | $559 | Not Implemented |
LS2007 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $235,346 | $155,805 | Not Implemented |
LS2007 # 06 Y:2020 | 06 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $324 | $970 | Not Implemented |
LS2007 # 07 Y:2020 | 07 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $75,962 | $304,000 | Not Implemented |
LS2007 # 08 Y:2020 | 08 | 2020 | OPTIMIZE PLANT POWER FACTOR | $8,178 | $56,728 | Not Implemented |
LS2007 # 09 Y:2020 | 09 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,595 | $34,100 | Not Implemented |
IC0244 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,228 | $517 | Implemented |
IC0244 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,307 | $4,150 | Implemented |
IC0244 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $732 | $534 | Not Implemented |
IC0244 # 04 Y:2020 | 04 | 2020 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,190 | $6,120 | Not Implemented |
MZ0292 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,645 | $29,820 | Implemented |
MZ0292 # 02 Y:2020 | 02 | 2020 | INSTALL OCCUPANCY SENSORS | $460 | $1,000 | Implemented |
MZ0292 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,098 | $5,000 | Implemented |
MZ0292 # 04 Y:2020 | 04 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $12,892 | $4,700 | Not Implemented |
MZ0292 # 05 Y:2020 | 05 | 2020 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $130 | $50 | Implemented |
MZ0292 # 06 Y:2020 | 06 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $62,704 | $59,378 | Not Implemented |
MZ0292 # 07 Y:2020 | 07 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $18,874 | $22,200 | Not Implemented |
MZ0292 # 08 Y:2020 | 08 | 2020 | USE PHOTOCELL CONTROLS | $43 | $73 | Implemented |