IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,754

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0367 # 01 Y:2020 01 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $38,331 $2,480 Implemented
MI0367 # 02 Y:2020 02 2020 USE BATTERY STORAGE FOR DEMAND CONTROL $21,335 $38,237 Not Implemented
MI0367 # 03 Y:2020 03 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $18,517 $2,480 Implemented
MI0367 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,815 $120 Implemented
MI0367 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,479 $9,842 Implemented
MI0367 # 06 Y:2020 06 2020 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,241 $4,900 Not Implemented
MI0367 # 07 Y:2020 07 2020 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $3,190 $2,500 Not Implemented
MI0367 # 08 Y:2020 08 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,348 $1,980 Not Implemented
TR0021 # 01 Y:2020 01 2020 INSTALL OCCUPANCY SENSORS $183 $210 Not Implemented
TR0021 # 02 Y:2020 02 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $35,728 $7,275 Implemented
TR0021 # 03 Y:2020 03 2020 USE MECHANICAL STRIPPING METHODS $2,731 $666 Implemented
TR0021 # 04 Y:2020 04 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,409 $0 Not Implemented
UK1916 # 01 Y:2019 01 2019 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $1,170 $0 n/a
UK1916 # 02 Y:2019 02 2019 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $18,894 $0 n/a
UK1916 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,394 $25,674 n/a
UK1916 # 04 Y:2019 04 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $195 $75 n/a
UK1916 # 05 Y:2019 05 2019 AIR CONDITION ONLY SPACE NECESSARY $4,922 $11,550 n/a
UK1916 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $29,402 $2,614 n/a
UK1916 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,602 $2,270 n/a
UK1916 # 08 Y:2019 08 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,946 $0 n/a
UK1916 # 09 Y:2019 09 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $86,132 $206,000 n/a
UK1916 # 10 Y:2019 10 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $139,706 $225,000 n/a
UU0157 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,321 $68,567 Implemented
UU0157 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $2,079 $4,000 Implemented
UU0157 # 03 Y:2019 03 2019 USE RADIANT HEATER FOR SPOT HEATING $12,670 $22,920 Implemented