Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,763
matching recommendationsNAICS | 336 | Transportation Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1908 # 10 Y:2019 | 10 | 2019 | REDUCE FLUID FLOW RATES | $2,913 | $1,900 | Not Implemented |
UK1908 # 11 Y:2019 | 11 | 2019 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $13,831 | $5,000 | Not Implemented |
UK1908 # 12 Y:2019 | 12 | 2019 | CLEAN CONDENSER TUBES | $15,832 | $7,858 | Implemented |
UK1908 # 13 Y:2019 | 13 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,547 | $8,300 | Implemented |
UK1908 # 14 Y:2019 | 14 | 2019 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $3,671 | $2,684 | Not Implemented |
UK1908 # 15 Y:2019 | 15 | 2019 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $63,247 | $2,368 | Implemented |
UK1908 # 16 Y:2019 | 16 | 2019 | INSULATE BARE EQUIPMENT | $13,639 | $18,226 | Not Implemented |
UK1908 # 17 Y:2019 | 17 | 2019 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $1,430 | $0 | Implemented |
UK1908 # 18 Y:2019 | 18 | 2019 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $21,879 | $28,230 | Not Implemented |
UD1000 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $12,280 | $0 | Implemented |
UD1000 # 02 Y:2019 | 02 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,606 | $0 | Not Implemented |
UD1000 # 03 Y:2019 | 03 | 2019 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,599 | $0 | Implemented |
UD1000 # 04 Y:2019 | 04 | 2019 | USE OPTIMUM THICKNESS INSULATION | $2,318 | $290 | Not Implemented |
UD1000 # 05 Y:2019 | 05 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,102 | $0 | Not Implemented |
UD1000 # 06 Y:2019 | 06 | 2019 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $71,143 | $12,480 | Not Implemented |
UD1000 # 07 Y:2019 | 07 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $24,374 | $48,748 | Not Implemented |
UD1000 # 08 Y:2019 | 08 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,801 | $81,000 | Implemented |
UD1000 # 09 Y:2019 | 09 | 2019 | INSTALL OCCUPANCY SENSORS | $1,925 | $8,061 | Implemented |
NC0635 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $483 | $600 | Implemented |
NC0635 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,794 | $30,000 | Implemented |
NC0635 # 03 Y:2019 | 03 | 2019 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,154 | $3,120 | Not Implemented |
NC0635 # 04 Y:2019 | 04 | 2019 | REPAIR AND ELIMINATE STEAM LEAKS | $2,165 | $850 | Implemented |
NC0635 # 05 Y:2019 | 05 | 2019 | INSULATE BARE EQUIPMENT | $9,539 | $12,600 | Not Implemented |
AS0476 # 01 Y:2019 | 01 | 2019 | INSTALL WIND POWERED ELECTRIC GENERATOR | $924,031 | $7,925,140 | Not Implemented |
AS0476 # 02 Y:2019 | 02 | 2019 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $379,615 | $78,024 | Not Implemented |