IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

293

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0084 # 09 Y:2017 09 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $910 $416 Not Implemented
IP0084 # 10 Y:2017 10 2017 APPLY FOR INVESTMENT INCENTIVES $238 $125 Not Implemented
IP0084 # 11 Y:2017 11 2017 INSTALL OCCUPANCY SENSORS $3,393 $2,038 Implemented
IP0084 # 12 Y:2017 12 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $519 $727 Not Implemented
IP0084 # 13 Y:2017 13 2017 ELIMINATE LEAKS IN WATER LINES AND VALVES $446 $1,250 Implemented
IP0084 # 14 Y:2017 14 2017 OPTIMIZE PLANT POWER FACTOR $13,460 $43,320 Not Implemented
IP0084 # 15 Y:2017 15 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,680 $25,865 Implemented
IP0083 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $25,016 $5 Implemented
IP0083 # 02 Y:2017 02 2017 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $15,779 $5 Not Implemented
IP0083 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $3,290 $0 Implemented
IP0083 # 04 Y:2017 04 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,706 $0 Implemented
IP0083 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $20,472 $1,434 Not Implemented
IP0083 # 06 Y:2017 06 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $15,077 $1,296 Implemented
IP0083 # 07 Y:2017 07 2017 INSTALL OCCUPANCY SENSORS $13,276 $7,860 Implemented
IP0083 # 08 Y:2017 08 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,581 $23,044 Implemented
IP0083 # 09 Y:2017 09 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,902 $3,417 Implemented
IP0083 # 10 Y:2017 10 2017 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $3,250 $5,000 Not Implemented
IP0083 # 11 Y:2017 11 2017 OPTIMIZE PLANT POWER FACTOR $8,640 $34,900 Not Implemented
IP0069 # 01 Y:2016 01 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $490 $0 Implemented
IP0069 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,282 $21 Implemented
IP0069 # 03 Y:2016 03 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $5,637 $3 Not Implemented
IP0069 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $9,327 $377 Implemented
IP0069 # 05 Y:2016 05 2016 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $50 $5 Not Implemented
IP0069 # 06 Y:2016 06 2016 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,989 $215 Implemented
IP0069 # 07 Y:2016 07 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $27,384 $7,218 Implemented