IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

77

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0154 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $679 $280 Not Implemented
BS0154 # 05 Y:2021 05 2021 ADOPT IN-HOUSE MATERIAL GENERATION $182,277 $204,462 Not Implemented
BS0154 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,232 $320 Not Implemented
BS0154 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,750 $3,231 Not Implemented
BS0154 # 04 Y:2021 04 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $766 $25 Not Implemented
BS0154 # 07 Y:2021 07 2021 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $893 $710 Not Implemented
BS0154 # 06 Y:2021 06 2021 RECOVER WASTE HEAT FROM EQUIPMENT $8,288 $6,000 Not Implemented
BS0134 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,955 $12,790 Not Implemented
BS0134 # 04 Y:2020 04 2020 UPGRADE CONTROLS ON COMPRESSORS $1,507 $3,280 Not Implemented
BS0134 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $618 $405 Not Implemented
BS0134 # 02 Y:2020 02 2020 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $2,687 $7,120 Not Implemented
BS0134 # 03 Y:2020 03 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,704 $1,017 Not Implemented
BS0134 # 06 Y:2020 06 2020 INSTALL OCCUPANCY SENSORS $760 $1,471 Not Implemented
BS0102 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $7,306 $495 Implemented
BS0102 # 08 Y:2017 08 2017 PAY UTILITY BILLS ON TIME $874 $144 Implemented
BS0102 # 07 Y:2017 07 2017 INSTALL OCCUPANCY SENSORS $91 $85 Not Implemented
BS0102 # 06 Y:2017 06 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $436 $672 Implemented
BS0102 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,365 $734 Implemented
BS0102 # 04 Y:2017 04 2017 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $194 $682 Not Implemented
BS0102 # 03 Y:2017 03 2017 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,991 $1,301 Not Implemented
BS0102 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,159 $10,362 Implemented
BS0100 # 07 Y:2017 07 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,572 $14,699 Not Implemented
BS0100 # 06 Y:2017 06 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $80 $100 Not Implemented
BS0100 # 05 Y:2017 05 2017 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $640 $8 Not Implemented
BS0100 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $284 $39 Not Implemented