IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0237 # 07 Y:2024 07 2024 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $682 $4,000 n/a
DL0237 # 09 Y:2024 09 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,873 $30,027 n/a
DL0237 # 04 Y:2024 04 2024 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,180 $64 n/a
DL0237 # 06 Y:2024 06 2024 RECOVER WASTE HEAT FROM EQUIPMENT $3,985 $4,000 n/a
DL0237 # 01 Y:2024 01 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,341 $0 n/a
DL0237 # 02 Y:2024 02 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,667 $0 n/a
DL0237 # 05 Y:2024 05 2024 REDUCE VENTILATION AIR $1,145 $270 n/a
DL0237 # 08 Y:2024 08 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $333 $252 n/a
DL0237 # 03 Y:2024 03 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,998 $0 n/a
WV0609 # 08 Y:2021 08 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,444 $7,620 Not Implemented
WV0609 # 02 Y:2021 02 2021 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $13,040 $40,560 Not Implemented
WV0609 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $78,485 $318,088 Not Implemented
WV0609 # 10 Y:2021 10 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,211 $3,175 Implemented
WV0609 # 12 Y:2021 12 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $487 $1,350 Implemented
WV0609 # 11 Y:2021 11 2021 INSULATE BARE EQUIPMENT $1,192 $1,293 Implemented
WV0609 # 03 Y:2021 03 2021 OPTIMIZE PLANT POWER FACTOR $9,397 $42,210 Not Implemented
WV0609 # 07 Y:2021 07 2021 DEVELOP A REPAIR/REPLACE POLICY $3,040 $809 Implemented
WV0609 # 09 Y:2021 09 2021 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,405 $1,500 Implemented
WV0609 # 04 Y:2021 04 2021 UPGRADE CONTROLS ON COMPRESSORS $5,784 $14,420 Implemented
WV0609 # 06 Y:2021 06 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,657 $140 Implemented
WV0609 # 05 Y:2021 05 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,695 $3,480 Implemented
WV0487 # 08 Y:2014 08 2014 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,271 $210 Not Implemented
WV0487 # 07 Y:2014 07 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,533 $0 Implemented
WV0487 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $5,633 $2,520 Implemented
WV0487 # 05 Y:2014 05 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $9,081 $1,000 Implemented