Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
373
matching recommendationsNAICS | 336 | Transportation Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0187 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $38,219 | $6,260 | Implemented |
UA0187 # 01 Y:2017 | 01 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,441 | $1,892 | Not Implemented |
UA0187 # 04 Y:2017 | 04 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $33,082 | $14,405 | Not Implemented |
UA0187 # 06 Y:2017 | 06 | 2017 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $88,008 | $0 | Implemented |
UA0187 # 02 Y:2017 | 02 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $67,895 | $250 | Not Implemented |
UA0187 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,032 | $136,663 | Implemented |
TR0005 # 03 Y:2017 | 03 | 2017 | CHANGE METHOD OF DEIONIZED WATER PRODUCTION | $258,000 | $292,000 | Implemented |
TT0200 # 06 Y:2017 | 06 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,216 | $7,500 | Not Implemented |
TT0200 # 03 Y:2017 | 03 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,931 | $15,000 | Not Implemented |
TT0200 # 04 Y:2017 | 04 | 2017 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,952 | $15,000 | Not Implemented |
TR0005 # 10 Y:2017 | 10 | 2017 | ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS | $8,320 | $966 | Implemented |
TR0005 # 04 Y:2017 | 04 | 2017 | METER WASTE WATER | $11,708 | $2,650 | Implemented |
TR0005 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $223 | $399 | Implemented |
TT0200 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,941 | $3,050 | Not Implemented |
TR0005 # 08 Y:2017 | 08 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $287 | $494 | Implemented |
TR0005 # 02 Y:2017 | 02 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $1,056 | $417 | Not Implemented |
TR0005 # 05 Y:2017 | 05 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $15,338 | $56,000 | Implemented |
TR0005 # 01 Y:2017 | 01 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $4,452 | $6,500 | Implemented |
TR0005 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,836 | $8,821 | Implemented |
TT0200 # 07 Y:2017 | 07 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,772 | $1,000 | Implemented |
TR0005 # 11 Y:2017 | 11 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,882 | $25,954 | Implemented |
TT0200 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,708 | $63 | Not Implemented |
TT0200 # 02 Y:2017 | 02 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $9,558 | $46,250 | Implemented |
TR0005 # 09 Y:2017 | 09 | 2017 | ISOLATE HOT OR COLD EQUIPMENT | $292 | $1,422 | Not Implemented |
IP0092 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $112,756 | $41,810 | Implemented |