IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

260

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1021 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,342 $0 Implemented
UD1021 # 03 Y:2020 03 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,965 $1,400 Not Implemented
UD1021 # 02 Y:2020 02 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $32,724 $0 Implemented
UD1021 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,283 $0 Implemented
UU0170 # 06 Y:2020 06 2020 INSULATE BARE EQUIPMENT $676 $440 Implemented
UU0170 # 05 Y:2020 05 2020 INSULATE BARE EQUIPMENT $1,259 $1,259 Not Implemented
UU0170 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,521 $150 Implemented
UU0170 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,825 $21,841 Implemented
UU0170 # 02 Y:2020 02 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $13,868 $2,000 Implemented
UU0170 # 03 Y:2020 03 2020 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $1,681 $1,200 Not Implemented
OK1031 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,935 $21,052 Implemented
OK1031 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,015 $8,099 Not Implemented
OK1031 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,053 $4,865 Not Implemented
OK1031 # 04 Y:2020 04 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,011 $1,186 Implemented
OK1031 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,590 $745 Implemented
OK1031 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,734 $0 Implemented
NL0049 # 01 Y:2020 01 2020 OPTIMIZE PLANT POWER FACTOR $27,083 $43,749 Not Implemented
NL0049 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,662 $4,000 Not Implemented
NL0049 # 05 Y:2020 05 2020 INSTALL SUB-METERING EQUIPMENT $2,954 $354 Implemented
NL0049 # 06 Y:2020 06 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,894 $2,550 Not Implemented
NL0049 # 04 Y:2020 04 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,390 $90 Not Implemented
NL0049 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,291 $28,235 Implemented
NL0049 # 07 Y:2020 07 2020 INSULATE BARE EQUIPMENT $1,475 $460 Not Implemented
SD0597 # 05 Y:2020 05 2020 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $691 $1,720 Not Implemented
SD0597 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,307 $5,611 Not Implemented