IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

260

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0597 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,547 $225 Implemented
SD0597 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,307 $5,611 Not Implemented
SD0597 # 05 Y:2020 05 2020 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $691 $1,720 Not Implemented
MI0375 # 01 Y:2020 01 2020 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $9,722 $20,153 Implemented
MI0375 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,712 $2,100 Implemented
MI0375 # 03 Y:2020 03 2020 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,971 $965 Not Implemented
MI0375 # 04 Y:2020 04 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,948 $2,692 Not Implemented
MI0375 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,932 $4,843 Implemented
MI0375 # 06 Y:2020 06 2020 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $939 $280 Implemented
MI0375 # 07 Y:2020 07 2020 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $911 $1,214 Not Implemented
MI0375 # 08 Y:2020 08 2020 INSTALL OCCUPANCY SENSORS $617 $1,522 Implemented
MI0375 # 09 Y:2020 09 2020 UPGRADE CONTROLS ON COMPRESSORS $339 $984 Implemented
IP0137 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $2,249 $0 Implemented
IP0137 # 02 Y:2020 02 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $609 $0 Implemented
IP0137 # 03 Y:2020 03 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $64,260 $1,554 Not Implemented
IP0137 # 04 Y:2020 04 2020 RECOVER WASTE HEAT FROM EQUIPMENT $6,117 $2,100 Implemented
IP0137 # 05 Y:2020 05 2020 USE PHOTOCELL CONTROLS $184 $138 Not Implemented
IP0137 # 06 Y:2020 06 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $789 $1,348 Implemented
IP0137 # 07 Y:2020 07 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,777 $4,138 Implemented
IP0137 # 08 Y:2020 08 2020 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $14,497 $39,760 Not Implemented
GT0947 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,436 $325 Implemented
GT0947 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $606 $250 Not Implemented
GT0947 # 03 Y:2020 03 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,554 $800 Not Implemented
GT0947 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $1,921 $2,060 Not Implemented
GT0947 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,659 $4,515 Implemented