IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

59

matching recommendations
Reset
NAICS 3361 Motor Vehicle Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1046 # 07 Y:2022 07 2022 RECOVER WASTE HEAT FROM EQUIPMENT $12,615 $1,500 Not Implemented
UD1046 # 14 Y:2022 14 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $386,941 $554,028 Implemented
UD1046 # 13 Y:2022 13 2022 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $127,137 $75,000 Implemented
UD1046 # 12 Y:2022 12 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,614 $5,220 Not Implemented
UD1046 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,795 $3,279 Not Implemented
UD1046 # 09 Y:2022 09 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $35,495 $1,200 Not Implemented
UD1046 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,166 $0 Implemented
UD1046 # 02 Y:2022 02 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,323 $0 Not Implemented
UD1046 # 11 Y:2022 11 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,765 $4,001 Not Implemented
UD1046 # 08 Y:2022 08 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $27,755 $60,000 Not Implemented
UD1046 # 10 Y:2022 10 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,940 $0 Not Implemented
UD1046 # 01 Y:2022 01 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $22,214 $200,000 Implemented
UD1046 # 03 Y:2022 03 2022 IMPROVE COMBUSTION CONTROL CAPABILITY $261,813 $100 Not Implemented
UD1046 # 04 Y:2022 04 2022 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $43,076 $3,500 Implemented
WV0550 # 04 Y:2017 04 2017 USE EVAPORATION TO CONCENTRATE MATERIAL $11,740 $40,000 Not Implemented
WV0550 # 12 Y:2017 12 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,173 $64 Implemented
WV0550 # 11 Y:2017 11 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,230 $1,100 Implemented
WV0550 # 10 Y:2017 10 2017 OPTIMIZE PLANT POWER FACTOR $4,200 $14,250 Not Implemented
WV0550 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $4,238 $3,925 Implemented
WV0550 # 08 Y:2017 08 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,057 $30,000 Not Implemented
WV0550 # 07 Y:2017 07 2017 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $6,922 $31,792 Not Implemented
WV0550 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,544 $16,928 Implemented
WV0550 # 05 Y:2017 05 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,954 $0 Implemented
WV0550 # 16 Y:2017 16 2017 INSULATE BARE EQUIPMENT $496 $1,754 Implemented
WV0550 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,622 $254 Implemented