Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsNAICS | 33611 | Automobile and Light Duty Motor Vehicle Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0550 # 13 Y:2017 | 13 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $2,757 | $647 | Implemented |
WV0550 # 12 Y:2017 | 12 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,173 | $64 | Implemented |
WV0550 # 11 Y:2017 | 11 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,230 | $1,100 | Implemented |
WV0550 # 10 Y:2017 | 10 | 2017 | OPTIMIZE PLANT POWER FACTOR | $4,200 | $14,250 | Not Implemented |
WV0550 # 09 Y:2017 | 09 | 2017 | INSTALL OCCUPANCY SENSORS | $4,238 | $3,925 | Implemented |
WV0550 # 08 Y:2017 | 08 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,057 | $30,000 | Not Implemented |
WV0550 # 07 Y:2017 | 07 | 2017 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $6,922 | $31,792 | Not Implemented |
WV0550 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,544 | $16,928 | Implemented |
WV0550 # 05 Y:2017 | 05 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,954 | $0 | Implemented |
WV0550 # 04 Y:2017 | 04 | 2017 | USE EVAPORATION TO CONCENTRATE MATERIAL | $11,740 | $40,000 | Not Implemented |
WV0550 # 03 Y:2017 | 03 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $13,118 | $15,322 | Not Implemented |
WV0550 # 02 Y:2017 | 02 | 2017 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $13,325 | $1,000 | Implemented |
WV0550 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,622 | $254 | Implemented |
WV0550 # 16 Y:2017 | 16 | 2017 | INSULATE BARE EQUIPMENT | $496 | $1,754 | Implemented |
WV0550 # 14 Y:2017 | 14 | 2017 | USE POWER DURING OFF-PEAK PERIODS | $2,151 | $443 | Not Implemented |
WV0550 # 15 Y:2017 | 15 | 2017 | INSULATE BARE EQUIPMENT | $610 | $1,042 | Implemented |
UD0941 # 13 Y:2016 | 13 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,165 | $35,457 | Implemented |
UD0941 # 12 Y:2016 | 12 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,616 | $11,550 | Not Implemented |
UD0941 # 11 Y:2016 | 11 | 2016 | USE RADIANT HEATER FOR SPOT HEATING | $4,035 | $3,850 | Not Implemented |
UD0941 # 09 Y:2016 | 09 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $930 | $2,000 | Not Implemented |
UD0941 # 08 Y:2016 | 08 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $943 | $3,250 | Not Implemented |
UD0941 # 06 Y:2016 | 06 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $3,537 | $50 | Implemented |
UD0941 # 05 Y:2016 | 05 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $13,109 | $4,500 | Not Implemented |
UD0941 # 04 Y:2016 | 04 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $41 | $285 | Implemented |
UD0941 # 03 Y:2016 | 03 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,441 | $0 | Implemented |