IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
NAICS 336120 Heavy Duty Truck Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1046 # 14 Y:2022 14 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $386,941 $554,028 Implemented
UD1046 # 13 Y:2022 13 2022 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $127,137 $75,000 Implemented
UD1046 # 12 Y:2022 12 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,614 $5,220 Not Implemented
UD1046 # 11 Y:2022 11 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,765 $4,001 Not Implemented
UD1046 # 10 Y:2022 10 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,940 $0 Not Implemented
UD1046 # 09 Y:2022 09 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $35,495 $1,200 Not Implemented
UD1046 # 08 Y:2022 08 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $27,755 $60,000 Not Implemented
UD1046 # 07 Y:2022 07 2022 RECOVER WASTE HEAT FROM EQUIPMENT $12,615 $1,500 Not Implemented
UD1046 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,166 $0 Implemented
UD1046 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,795 $3,279 Not Implemented
UD1046 # 04 Y:2022 04 2022 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $43,076 $3,500 Implemented
UD1046 # 03 Y:2022 03 2022 IMPROVE COMBUSTION CONTROL CAPABILITY $261,813 $100 Not Implemented
UD1046 # 02 Y:2022 02 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,323 $0 Not Implemented
UD1046 # 01 Y:2022 01 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $22,214 $200,000 Implemented
UD0872 # 15 Y:2013 15 2013 INSTALL TIMERS AND/OR THERMOSTATS $14,454 $16,450 Not Implemented
UD0872 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $10,877 $5,000 Implemented
UD0872 # 14 Y:2013 14 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $20,883 $41,766 Not Implemented
UD0872 # 13 Y:2013 13 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $538 $1,000 Implemented
UD0872 # 12 Y:2013 12 2013 ADJUST BURNERS FOR EFFICIENT OPERATION $2,274 $5,000 Not Implemented
UD0872 # 11 Y:2013 11 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $4,252 $2,000 Implemented
UD0872 # 10 Y:2013 10 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,273 $31,000 Not Implemented
UD0872 # 09 Y:2013 09 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,452 $5,725 Not Implemented
UD0872 # 08 Y:2013 08 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $13,506 $0 Not Implemented
UD0872 # 07 Y:2013 07 2013 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $14,025 $21,037 Not Implemented
UD0872 # 06 Y:2013 06 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $33,247 $3,000 Implemented