IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

627

matching recommendations
Reset
NAICS 3362 Motor Vehicle Body and Trailer Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0367 # 07 Y:2005 07 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $650 $1,270 Implemented
IA0367 # 08 Y:2005 08 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $11,267 $14,500 Not Implemented
IA0367 # 09 Y:2005 09 2005 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $8,580 $14,000 Not Implemented
IA0367 # 10 Y:2005 10 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,781 $500 Not Implemented
IA0367 # 11 Y:2005 11 2005 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,202 $1,640 Not Implemented
IA0367 # 12 Y:2005 12 2005 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,745 $28,000 Not Implemented
UM0281 # 01 Y:2005 01 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,337 $300 Implemented
UM0281 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,591 $3,891 Implemented
UM0281 # 03 Y:2005 03 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,961 $75 Implemented
UM0281 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,214 $75 Implemented
UM0281 # 05 Y:2005 05 2005 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $125 $100 Implemented
GT0794 # 01 Y:2004 01 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,414 $30,000 n/a
GT0794 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,785 $3,525 Not Implemented
GT0794 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $595 $765 Not Implemented
GT0794 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,306 $2,046 Implemented
GT0794 # 05 Y:2004 05 2004 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,022 $3,380 Not Implemented
GT0794 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,490 $2,500 Implemented
GT0794 # 07 Y:2004 07 2004 INSTALL TIMERS AND/OR THERMOSTATS $729 $1,500 Not Implemented
GT0794 # 08 Y:2004 08 2004 RECOVER WASTE HEAT FROM EQUIPMENT $8,773 $4,900 Not Implemented
GT0794 # 09 Y:2004 09 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,609 $0 Implemented
UM0223 # 01 Y:2003 01 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,160 $500 Implemented
UM0223 # 02 Y:2003 02 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,344 $958 Implemented
UM0223 # 03 Y:2003 03 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,704 $5,850 Not Implemented
UM0223 # 04 Y:2003 04 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $23,898 $3,150 Not Implemented
UM0223 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,530 $3,000 Implemented