IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

100

matching recommendations
Reset
NAICS 3362 Motor Vehicle Body and Trailer Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0649 # 04 Y:2023 04 2023 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $10,248 $20,166 Not Implemented
WV0649 # 08 Y:2023 08 2023 DEVELOP A REPAIR/REPLACE POLICY $6,156 $1,439 Implemented
WV0649 # 09 Y:2023 09 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,697 $13,390 Implemented
WV0649 # 03 Y:2023 03 2023 UPGRADE CONTROLS ON COMPRESSORS $10,514 $13,660 Not Implemented
WV0649 # 02 Y:2023 02 2023 PREHEAT COMBUSTION AIR WITH WASTE HEAT $13,485 $18,440 Not Implemented
WV0649 # 10 Y:2023 10 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,665 $407 Implemented
WV0649 # 13 Y:2023 13 2023 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $740 $2,930 Not Implemented
WV0649 # 07 Y:2023 07 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,255 $3,000 Implemented
WV0649 # 06 Y:2023 06 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,203 $4,464 Not Implemented
WV0649 # 01 Y:2023 01 2023 INSULATE BARE EQUIPMENT $19,114 $9,160 Implemented
WV0649 # 11 Y:2023 11 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,381 $528 Implemented
WV0649 # 14 Y:2023 14 2023 INSTALL OCCUPANCY SENSORS $283 $608 Implemented
WV0649 # 05 Y:2023 05 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $9,620 $1,500 Implemented
WV0649 # 12 Y:2023 12 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $747 $2,233 Not Implemented
UD1034 # 06 Y:2022 06 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $725 $1,500 Not Implemented
UD1034 # 09 Y:2022 09 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,496 $1,515,645 Implemented
UD1034 # 08 Y:2022 08 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,596 $0 Not Implemented
UD1034 # 07 Y:2022 07 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,730 $31,075 Not Implemented
UD1034 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,843 $0 Implemented
UD1034 # 02 Y:2022 02 2022 USE RADIANT HEATER FOR SPOT HEATING $4,443 $0 Not Implemented
UD1034 # 03 Y:2022 03 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $573 $0 Implemented
UD1034 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,218 $360 Not Implemented
UD1034 # 01 Y:2022 01 2022 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $11,472 $0 Implemented
UD1006 # 03 Y:2019 03 2019 UTILIZE A LESS EXPENSIVE COOLING METHOD $27,201 $54,202 Not Implemented
UD1006 # 02 Y:2019 02 2019 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $125,929 $30,000 Not Implemented