Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
83
matching recommendationsNAICS | 3362 | Motor Vehicle Body and Trailer Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0445 # 08 Y:2009 | 08 | 2009 | REDUCE VENTILATION AIR | $18,248 | $20,000 | Not Implemented |
IA0445 # 04 Y:2009 | 04 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,460 | $100 | Not Implemented |
IA0445 # 02 Y:2009 | 02 | 2009 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $962 | $81 | Not Implemented |
IA0445 # 09 Y:2009 | 09 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $450 | $134 | Not Implemented |
IA0445 # 07 Y:2009 | 07 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,414 | $25 | Not Implemented |
IA0445 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,949 | $19,383 | Not Implemented |
IA0445 # 05 Y:2009 | 05 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,180 | $560 | Not Implemented |
IA0445 # 03 Y:2009 | 03 | 2009 | INSTALL OCCUPANCY SENSORS | $1,603 | $4,551 | Not Implemented |
IA0445 # 06 Y:2009 | 06 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,637 | $506 | Not Implemented |
UM0353 # 04 Y:2009 | 04 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $22,368 | $3,000 | Implemented |
UM0353 # 06 Y:2009 | 06 | 2009 | USE OPTIMUM TEMPERATURE | $13,085 | $200 | Implemented |
UM0353 # 05 Y:2009 | 05 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $16,734 | $200 | Not Implemented |
UM0353 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $186,999 | $237,500 | Implemented |
UM0353 # 03 Y:2009 | 03 | 2009 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $22,477 | $22,000 | Not Implemented |
UM0353 # 02 Y:2009 | 02 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $26,834 | $500 | Implemented |
UM0353 # 07 Y:2009 | 07 | 2009 | INSTALL OCCUPANCY SENSORS | $9,160 | $6,330 | Not Implemented |
UM0353 # 08 Y:2009 | 08 | 2009 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $3,526 | $1,500 | Implemented |
BD0364 # 07 Y:2009 | 07 | 2009 | USE RADIANT HEATER FOR SPOT HEATING | $4,732 | $8,000 | Not Implemented |
BD0364 # 08 Y:2009 | 08 | 2009 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,047 | $800 | Not Implemented |
BD0364 # 09 Y:2009 | 09 | 2009 | MODIFY STARTUP/SHUTDOWN TIMES | $418 | $0 | Not Implemented |
BD0364 # 05 Y:2009 | 05 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $118 | $500 | Not Implemented |
BD0364 # 04 Y:2009 | 04 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $327 | $0 | Not Implemented |
BD0364 # 03 Y:2009 | 03 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,526 | $1,000 | Not Implemented |
BD0364 # 02 Y:2009 | 02 | 2009 | INSTALL OCCUPANCY SENSORS | $2,782 | $2,025 | Not Implemented |
BD0364 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,695 | $55,216 | Not Implemented |