IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,360

matching recommendations
Reset
NAICS 3363 Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2308 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $2,423 $1,362 Not Implemented
UL2308 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,994 $2,560 Not Implemented
UL2308 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $135,738 $1,570,854 Not Implemented
UL2308 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $109,084 $64,636 Not Implemented
UL2308 # 06 Y:2023 06 2023 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $8,204 $36,450 Not Implemented
UL2308 # 07 Y:2023 07 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,871 $15,000 Not Implemented
AM0887 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,830 $1,000 Implemented
AM0887 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,300 $0 Not Implemented
AM0887 # 03 Y:2023 03 2023 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $3,790 $8,650 Not Implemented
AM0887 # 04 Y:2023 04 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,360 $303 Implemented
AM0887 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,340 $850 Implemented
AM0887 # 06 Y:2023 06 2023 USE SYNTHETIC LUBRICANT $860 $440 Not Implemented
AM0887 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $912 $1,783 Implemented
NL0084 # 01 Y:2023 01 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $84,081 $91,000 n/a
NL0084 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $41,028 $500 n/a
NL0084 # 03 Y:2023 03 2023 ADOPT IN-HOUSE MATERIAL GENERATION $24,791 $50,000 n/a
NL0084 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $17,812 $13,150 n/a
NL0084 # 05 Y:2023 05 2023 METER WASTE WATER $10,034 $9,984 n/a
NL0084 # 06 Y:2023 06 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,562 $9,563 n/a
NL0084 # 07 Y:2023 07 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,201 $2,875 n/a
NL0084 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $366 $580 n/a
MS0417 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $1,912 $3,171 Not Implemented
MS0417 # 02 Y:2023 02 2023 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $2,264 $21,500 Not Implemented
MS0417 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,886 $2,761 Implemented
MS0417 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $210,258 $2,164,995 Not Implemented