IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

447

matching recommendations
Reset
NAICS 3363 Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0346 # 08 Y:2008 08 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,284 $0 Not Implemented
UM0346 # 09 Y:2008 09 2008 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $548 $280 Not Implemented
UM0345 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,365 $7,499 Not Implemented
UM0345 # 02 Y:2008 02 2008 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $8,397 $1,650 Implemented
UM0345 # 03 Y:2008 03 2008 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,558 $0 Implemented
UM0345 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,336 $460 Implemented
UM0345 # 05 Y:2008 05 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $653 $544 Not Implemented
UM0342 # 01 Y:2008 01 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,661 $7,350 Not Implemented
UM0342 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,313 $7,500 Implemented
UM0342 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,736 $13,776 Not Implemented
UM0342 # 04 Y:2008 04 2008 REDUCE VENTILATION AIR $2,824 $1,228 Not Implemented
UM0342 # 05 Y:2008 05 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,462 $515 Not Implemented
UM0342 # 06 Y:2008 06 2008 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,437 $0 Not Implemented
UM0342 # 07 Y:2008 07 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $798 $638 Implemented
UM0337 # 01 Y:2008 01 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $16,708 $8,050 Not Implemented
UM0337 # 02 Y:2008 02 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,515 $240 Implemented
UM0337 # 03 Y:2008 03 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,264 $990 Not Implemented
UM0337 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,938 $8,520 Not Implemented
UM0337 # 05 Y:2008 05 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,090 $942 Not Implemented
UM0337 # 06 Y:2008 06 2008 INSULATE BARE EQUIPMENT $791 $478 Implemented
UM0337 # 07 Y:2008 07 2008 INSTALL OCCUPANCY SENSORS $666 $510 Not Implemented
UM0335 # 01 Y:2008 01 2008 RECOVER WASTE HEAT FROM EQUIPMENT $89,698 $182,750 Not Implemented
UM0335 # 02 Y:2008 02 2008 RECOVER WASTE HEAT FROM EQUIPMENT $74,186 $72,325 Not Implemented
UM0335 # 03 Y:2008 03 2008 REDUCE VENTILATION AIR $36,521 $12,950 Not Implemented
UM0335 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $31,917 $18,591 Not Implemented