IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

96

matching recommendations
Reset
NAICS 3363 Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0242 # 04 Y:2017 04 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $191 $0 Implemented
MZ0242 # 03 Y:2017 03 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $287 $0 Implemented
MZ0242 # 02 Y:2017 02 2017 RECOVER WASTE HEAT FROM EQUIPMENT $2,451 $550 Implemented
MZ0242 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $392 $50 Implemented
MZ0161 # 02 Y:2014 02 2014 RECOVER WASTE HEAT FROM EQUIPMENT $5,393 $11,000 Not Implemented
MZ0161 # 01 Y:2014 01 2014 UPGRADE CONTROLS ON COMPRESSORS $54,484 $150,000 Not Implemented
MZ0161 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $36,359 $45,000 Not Implemented
MZ0161 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,710 $12,000 Implemented
MZ0161 # 05 Y:2014 05 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $60,132 $0 Not Implemented
MZ0137 # 03 Y:2014 03 2014 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $856 $2,050 Implemented
MZ0137 # 08 Y:2014 08 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,678 $7,200 Not Implemented
MZ0137 # 07 Y:2014 07 2014 AIR CONDITION ONLY SPACE NECESSARY $4,215 $0 Not Implemented
MZ0137 # 06 Y:2014 06 2014 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $8,378 $0 Implemented
MZ0137 # 05 Y:2014 05 2014 RECOVER WASTE HEAT FROM EQUIPMENT $805 $1,475 Implemented
MZ0137 # 04 Y:2014 04 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $16,610 $0 Implemented
MZ0137 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $1,989 $1,920 Implemented
MZ0137 # 01 Y:2014 01 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,036 $0 Not Implemented
MZ0124 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,890 $900 Implemented
MZ0124 # 02 Y:2013 02 2013 RECOVER WASTE HEAT FROM EQUIPMENT $10,497 $15,000 Not Implemented
MZ0124 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,319 $0 Not Implemented
MZ0124 # 06 Y:2013 06 2013 USE COMPRESSOR AIR FILTERS $1,594 $850 Implemented
MZ0124 # 05 Y:2013 05 2013 AIR CONDITION ONLY SPACE NECESSARY $32,690 $12,531 Not Implemented
MZ0124 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,532 $45,540 Implemented
MZ0049 # 09 Y:2010 09 2010 COMBINE UTILITY METERS $288 $0 Not Implemented
MZ0049 # 12 Y:2010 12 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,900 $37,600 Implemented