IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

231

matching recommendations
Reset
NAICS 3363 Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0034 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,425 $89,660 Not Implemented
IP0005 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $33,112 $0 Not Implemented
IP0005 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,540 $0 Implemented
IP0005 # 03 Y:2012 03 2012 INSULATE BARE EQUIPMENT $683 $0 Implemented
IP0005 # 04 Y:2012 04 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $997 $1,803 Not Implemented
IP0005 # 05 Y:2012 05 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $16,542 $37,000 Not Implemented
UD0776 # 01 Y:2008 01 2008 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $65,320 $0 Not Implemented
UD0776 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $48,929 $1,000 Implemented
UD0776 # 03 Y:2008 03 2008 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $47,472 $6,525 Not Implemented
UD0776 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $39,691 $0 Not Implemented
UD0776 # 05 Y:2008 05 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $38,304 $20,000 Not Implemented
UD0776 # 06 Y:2008 06 2008 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $30,220 $0 Implemented
UD0776 # 07 Y:2008 07 2008 REDUCE VENTILATION AIR $26,630 $160,000 Not Implemented
UD0776 # 08 Y:2008 08 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $22,000 $0 Not Implemented
UD0776 # 09 Y:2008 09 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,675 $45,000 Not Implemented
UD0776 # 10 Y:2008 10 2008 Hardware $8,341 $29,290 Not Implemented
UD0776 # 11 Y:2008 11 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,999 $7,312 Not Implemented
UD0776 # 12 Y:2008 12 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,278 $0 Not Implemented
UD0710 # 01 Y:2005 01 2005 INSTALL EQUIPMENT TO MOVE PRODUCT $215,424 $120,000 Implemented
UD0710 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,746 $56,952 Implemented
UD0710 # 03 Y:2005 03 2005 OPTIMIZE PLANT POWER FACTOR $8,824 $9,000 Not Implemented
UD0710 # 04 Y:2005 04 2005 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $3,908 $2,080 Not Implemented
UD0710 # 05 Y:2005 05 2005 UPGRADE CONTROLS ON COMPRESSORS $3,385 $0 Not Implemented
UD0710 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,911 $500 Not Implemented
UD0710 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,172 $2,964 Implemented