Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
58
matching recommendationsNAICS | 3363 | Motor Vehicle Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0375 # 06 Y:2020 | 06 | 2020 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $939 | $280 | Implemented |
MI0375 # 09 Y:2020 | 09 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $339 | $984 | Implemented |
MI0375 # 07 Y:2020 | 07 | 2020 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $911 | $1,214 | Not Implemented |
MI0375 # 08 Y:2020 | 08 | 2020 | INSTALL OCCUPANCY SENSORS | $617 | $1,522 | Implemented |
MI0375 # 01 Y:2020 | 01 | 2020 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $9,722 | $20,153 | Implemented |
MI0375 # 03 Y:2020 | 03 | 2020 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,971 | $965 | Not Implemented |
MI0375 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,712 | $2,100 | Implemented |
MI0375 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,932 | $4,843 | Implemented |
MI0375 # 04 Y:2020 | 04 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,948 | $2,692 | Not Implemented |
UF0504 # 01 Y:2017 | 01 | 2017 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $12,636 | $39,000 | Not Implemented |
UF0504 # 02 Y:2017 | 02 | 2017 | ADD AREA LIGHTING SWITCHES | $2,381 | $2,240 | Not Implemented |
UF0504 # 03 Y:2017 | 03 | 2017 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $1,236 | $700 | Not Implemented |
UF0504 # 04 Y:2017 | 04 | 2017 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $352,554 | $180,000 | Not Implemented |
UF0504 # 05 Y:2017 | 05 | 2017 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $15,187 | $28,820 | Not Implemented |
UF0504 # 06 Y:2017 | 06 | 2017 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $9,360 | $3,600 | Not Implemented |
MI0297 # 03 Y:2016 | 03 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $40,957 | $1,120 | Not Implemented |
MI0297 # 01 Y:2016 | 01 | 2016 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $97,105 | $82,600 | Not Implemented |
MI0297 # 04 Y:2016 | 04 | 2016 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $27,925 | $1,400 | Not Implemented |
MI0297 # 06 Y:2016 | 06 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $21,747 | $40 | Not Implemented |
MI0297 # 05 Y:2016 | 05 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $23,144 | $7,000 | Implemented |
MI0297 # 13 Y:2016 | 13 | 2016 | USE PHOTOCELL CONTROLS | $781 | $240 | Not Implemented |
MI0297 # 11 Y:2016 | 11 | 2016 | INSTALL OCCUPANCY SENSORS | $5,116 | $884 | Not Implemented |
MI0297 # 09 Y:2016 | 09 | 2016 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $9,631 | $16,156 | Not Implemented |
MI0297 # 14 Y:2016 | 14 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $335 | $944 | Implemented |
MI0297 # 10 Y:2016 | 10 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,934 | $10,031 | Not Implemented |