Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
58
matching recommendationsNAICS | 3363 | Motor Vehicle Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0375 # 01 Y:2020 | 01 | 2020 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $9,722 | $20,153 | Implemented |
MI0375 # 09 Y:2020 | 09 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $339 | $984 | Implemented |
MI0375 # 08 Y:2020 | 08 | 2020 | INSTALL OCCUPANCY SENSORS | $617 | $1,522 | Implemented |
MI0375 # 07 Y:2020 | 07 | 2020 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $911 | $1,214 | Not Implemented |
MI0375 # 06 Y:2020 | 06 | 2020 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $939 | $280 | Implemented |
MI0375 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,932 | $4,843 | Implemented |
MI0375 # 04 Y:2020 | 04 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,948 | $2,692 | Not Implemented |
MI0375 # 03 Y:2020 | 03 | 2020 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,971 | $965 | Not Implemented |
MI0375 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,712 | $2,100 | Implemented |
UF0504 # 04 Y:2017 | 04 | 2017 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $352,554 | $180,000 | Not Implemented |
UF0504 # 01 Y:2017 | 01 | 2017 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $12,636 | $39,000 | Not Implemented |
UF0504 # 02 Y:2017 | 02 | 2017 | ADD AREA LIGHTING SWITCHES | $2,381 | $2,240 | Not Implemented |
UF0504 # 05 Y:2017 | 05 | 2017 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $15,187 | $28,820 | Not Implemented |
UF0504 # 03 Y:2017 | 03 | 2017 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $1,236 | $700 | Not Implemented |
UF0504 # 06 Y:2017 | 06 | 2017 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $9,360 | $3,600 | Not Implemented |
MI0297 # 04 Y:2016 | 04 | 2016 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $27,925 | $1,400 | Not Implemented |
MI0297 # 01 Y:2016 | 01 | 2016 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $97,105 | $82,600 | Not Implemented |
MI0297 # 02 Y:2016 | 02 | 2016 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $65,063 | $200,000 | Not Implemented |
MI0297 # 03 Y:2016 | 03 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $40,957 | $1,120 | Not Implemented |
MI0297 # 07 Y:2016 | 07 | 2016 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $21,352 | $22,281 | Implemented |
MI0297 # 13 Y:2016 | 13 | 2016 | USE PHOTOCELL CONTROLS | $781 | $240 | Not Implemented |
MI0297 # 12 Y:2016 | 12 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,442 | $2,628 | Implemented |
MI0297 # 09 Y:2016 | 09 | 2016 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $9,631 | $16,156 | Not Implemented |
MI0297 # 06 Y:2016 | 06 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $21,747 | $40 | Not Implemented |
MI0297 # 08 Y:2016 | 08 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,133 | $1,660 | Implemented |