Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
53
matching recommendationsNAICS | 3363 | Motor Vehicle Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0092 # 05 Y:2017 | 05 | 2017 | INSTALL OCCUPANCY SENSORS | $635 | $42 | Implemented |
IP0092 # 03 Y:2017 | 03 | 2017 | PAY BILLS ON TIME TO AVOID LATE FEES | $7,288 | $0 | Implemented |
IP0092 # 04 Y:2017 | 04 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $546 | $31 | Implemented |
IP0092 # 06 Y:2017 | 06 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,898 | $1,119 | Implemented |
IP0092 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $112,756 | $41,810 | Implemented |
IP0092 # 02 Y:2017 | 02 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $876 | $0 | Implemented |
IP0092 # 01 Y:2017 | 01 | 2017 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,211 | $0 | Implemented |
UD0977 # 07 Y:2017 | 07 | 2017 | OPTIMIZE PLANT POWER FACTOR | $3,320 | $6,000 | Not Implemented |
UD0977 # 04 Y:2017 | 04 | 2017 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $47,239 | $23,800 | Not Implemented |
UD0977 # 05 Y:2017 | 05 | 2017 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $34,880 | $0 | Not Implemented |
UD0977 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,231 | $0 | Implemented |
UD0977 # 01 Y:2017 | 01 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $12,684 | $6,500 | Implemented |
UD0977 # 08 Y:2017 | 08 | 2017 | ADD AREA LIGHTING SWITCHES | $745 | $0 | Implemented |
UD0977 # 06 Y:2017 | 06 | 2017 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $16,048 | $2,000 | Implemented |
UD0977 # 09 Y:2017 | 09 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,687 | $57,949 | Not Implemented |
UD0977 # 02 Y:2017 | 02 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,960 | $0 | Implemented |
IC0195 # 04 Y:2017 | 04 | 2017 | USE MINIMUM STEAM OPERATING PRESSURE | $457 | $0 | Not Implemented |
IC0195 # 08 Y:2017 | 08 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $3,210 | $2,555 | Not Implemented |
IC0195 # 11 Y:2017 | 11 | 2017 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $697,569 | $2,619,820 | Not Implemented |
IC0195 # 06 Y:2017 | 06 | 2017 | REPLACE BOILER | $183,000 | $30,000 | Implemented |
IC0195 # 02 Y:2017 | 02 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,938 | $3,125 | Not Implemented |
IC0195 # 03 Y:2017 | 03 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $881 | $60 | Not Implemented |
IC0195 # 07 Y:2017 | 07 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $32,126 | $16,175 | Not Implemented |
IC0195 # 09 Y:2017 | 09 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,417 | $5,650 | Implemented |
IC0195 # 01 Y:2017 | 01 | 2017 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $7,465 | $3,408 | Not Implemented |