IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

96

matching recommendations
Reset
NAICS 3363 Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0434 # 03 Y:2024 03 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $6,585 $25,000 n/a
MS0434 # 04 Y:2024 04 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $35,214 $329,875 n/a
MS0434 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $536 $1,765 n/a
MS0434 # 01 Y:2024 01 2024 INSTALL OCCUPANCY SENSORS $401 $879 n/a
TT0314 # 06 Y:2024 06 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,036 $8,059 n/a
TT0314 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,281 $1,500 n/a
TT0314 # 08 Y:2024 08 2024 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,111 $4,500 n/a
TT0314 # 02 Y:2024 02 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $36,167 $16,000 n/a
TT0314 # 05 Y:2024 05 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,118 $21,260 n/a
TT0314 # 04 Y:2024 04 2024 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $8,319 $9,842 n/a
TT0314 # 01 Y:2024 01 2024 UPGRADE OBSOLETE EQUIPMENT $51,299 $312,500 n/a
TT0314 # 07 Y:2024 07 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,112 $0 n/a
MS0417 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $1,912 $3,171 Not Implemented
MS0417 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $210,258 $2,164,995 Not Implemented
MS0417 # 02 Y:2023 02 2023 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $2,264 $21,500 Not Implemented
MS0417 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,886 $2,761 Implemented
TT0278 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,020 $107,478 Implemented
TT0278 # 04 Y:2022 04 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,912 $18,000 Implemented
TT0278 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,152 $1,500 Implemented
TT0278 # 02 Y:2022 02 2022 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $14,885 $400 Not Implemented
TT0278 # 05 Y:2022 05 2022 INSTALL TIMERS AND/OR THERMOSTATS $4,507 $150 Not Implemented
TT0278 # 07 Y:2022 07 2022 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,425 $0 Implemented
TT0278 # 06 Y:2022 06 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $4,143 $0 Not Implemented
TT0278 # 08 Y:2022 08 2022 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $2,362 $2,736 Implemented
UA0202 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,355 $39,669 Implemented