Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
59
matching recommendationsNAICS | 3363 | Motor Vehicle Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0977 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $85,518 | $1,850 | n/a |
GT0977 # 02 Y:2024 | 02 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,957 | $1,500 | n/a |
GT0977 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,128 | $14,000 | n/a |
GT0977 # 04 Y:2024 | 04 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,327 | $12,892 | n/a |
GT0977 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $72,598 | $1,299,381 | n/a |
CC0003 # 02 Y:2022 | 02 | 2022 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,633 | $0 | n/a |
CC0003 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,652 | $12,041 | n/a |
CC0003 # 03 Y:2022 | 03 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $990 | $0 | n/a |
CC0003 # 04 Y:2022 | 04 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $5,980 | $0 | n/a |
CL2110 # 02 Y:2021 | 02 | 2021 | INSTALL OCCUPANCY SENSORS | $5,721 | $4,908 | n/a |
CL2110 # 07 Y:2021 | 07 | 2021 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $8,000 | $0 | n/a |
CL2110 # 06 Y:2021 | 06 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $22,030 | $0 | n/a |
CL2110 # 05 Y:2021 | 05 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,104 | $0 | n/a |
CL2110 # 04 Y:2021 | 04 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $607 | $0 | n/a |
CL2110 # 03 Y:2021 | 03 | 2021 | USE PHOTOCELL CONTROLS | $295 | $60 | n/a |
CL2110 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,493 | $18,147 | n/a |
CL2016 # 08 Y:2020 | 08 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,055 | $2,500 | Implemented |
CL2016 # 07 Y:2020 | 07 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $567 | $0 | Implemented |
CL2016 # 06 Y:2020 | 06 | 2020 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $797 | $0 | Implemented |
CL2016 # 05 Y:2020 | 05 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $967 | $400 | Not Implemented |
CL2016 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,257 | $43,750 | Not Implemented |
CL2016 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,376 | $1,720 | Implemented |
CL2016 # 02 Y:2020 | 02 | 2020 | INSTALL OCCUPANCY SENSORS | $5,838 | $656 | Implemented |
CL2016 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,588 | $3,733 | Implemented |
CL1901 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,368 | $13,023 | Implemented |