Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

80

matching recommendations
Reset
NAICS 3363 Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0887 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $912 $1,783 Implemented
AM0887 # 06 Y:2023 06 2023 USE SYNTHETIC LUBRICANT $860 $440 Not Implemented
AM0887 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,340 $850 Implemented
AM0887 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,830 $1,000 Implemented
AM0887 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,300 $0 Not Implemented
AM0887 # 03 Y:2023 03 2023 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $3,790 $8,650 Not Implemented
AM0887 # 04 Y:2023 04 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,360 $303 Implemented
NT0002 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $14,389 $21,853 Not Implemented
NT0002 # 07 Y:2023 07 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,880 $7,474 Implemented
NT0002 # 06 Y:2023 06 2023 AUTOMATE FINISHING PROCESS $96,307 $111,000 Not Implemented
NT0002 # 05 Y:2023 05 2023 ELIMINATE/REDUCE AN OPERATION $9,631 $0 Implemented
NT0002 # 04 Y:2023 04 2023 INSTALL SET-BACK TIMERS $1,504 $0 Implemented
NT0002 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,026 $2,499 Implemented
NT0002 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,414 $5,801 Implemented
TR0021 # 04 Y:2020 04 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,409 $0 Not Implemented
TR0021 # 03 Y:2020 03 2020 USE MECHANICAL STRIPPING METHODS $2,731 $666 Implemented
TR0021 # 02 Y:2020 02 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $35,728 $7,275 Implemented
TR0021 # 01 Y:2020 01 2020 INSTALL OCCUPANCY SENSORS $183 $210 Not Implemented
AM0742 # 01 Y:2018 01 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,300 $0 Implemented
AM0742 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,320 $4,200 Not Implemented
AM0742 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $670 $1,200 Not Implemented
AM0742 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,650 $600 Implemented
AM0742 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $880 $5 Implemented
TR0006 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,038 $21,816 n/a
TR0006 # 08 Y:2017 08 2017 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $23,655 $0 n/a