Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
173
matching recommendationsNAICS | 3363 | Motor Vehicle Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0451 # 01 Y:2014 | 01 | 2014 | OPTIMIZE PLANT POWER FACTOR | $16,165 | $25,000 | Implemented |
UM0451 # 04 Y:2014 | 04 | 2014 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,930 | $6,000 | Not Implemented |
UM0451 # 02 Y:2014 | 02 | 2014 | INSTALL OCCUPANCY SENSORS | $6,320 | $4,800 | Implemented |
UM0451 # 03 Y:2014 | 03 | 2014 | REVISE SMOKE CLEANUP FROM OPERATIONS | $79,670 | $60,000 | Not Implemented |
MZ0161 # 05 Y:2014 | 05 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $60,132 | $0 | Not Implemented |
MZ0161 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,710 | $12,000 | Implemented |
MZ0161 # 03 Y:2014 | 03 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $36,359 | $45,000 | Not Implemented |
MZ0161 # 02 Y:2014 | 02 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,393 | $11,000 | Not Implemented |
MZ0161 # 01 Y:2014 | 01 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $54,484 | $150,000 | Not Implemented |
UD0914 # 01 Y:2014 | 01 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $34,542 | $8,700 | Not Implemented |
UD0914 # 08 Y:2014 | 08 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $79,150 | $211,525 | Not Implemented |
UD0914 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,381 | $0 | Implemented |
UD0914 # 10 Y:2014 | 10 | 2014 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $22,626 | $0 | Not Implemented |
UD0914 # 06 Y:2014 | 06 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,960 | $5,000 | Not Implemented |
UD0914 # 05 Y:2014 | 05 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,264 | $5,000 | Not Implemented |
UD0914 # 09 Y:2014 | 09 | 2014 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $3,388 | $0 | Not Implemented |
UD0914 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $57,276 | $82,980 | Implemented |
UD0914 # 02 Y:2014 | 02 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,836 | $5,325 | Not Implemented |
UD0914 # 03 Y:2014 | 03 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $436 | $400 | Not Implemented |
NC0531 # 05 Y:2014 | 05 | 2014 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $625 | $100 | Implemented |
NC0531 # 06 Y:2014 | 06 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,956 | $1,935 | Not Implemented |
NC0531 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $874 | $1,255 | Not Implemented |
NC0531 # 01 Y:2014 | 01 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,220 | $200 | Implemented |
NC0531 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $836 | $240 | Implemented |
NC0531 # 07 Y:2014 | 07 | 2014 | DEVELOP A REPAIR/REPLACE POLICY | $2,202 | $4,256 | Implemented |